首页/ 题库 / [多选题]以下属于路基地面排水设施的有的答案

以下属于路基地面排水设施的有

多选题
2021-09-03 17:17
A、排水沟
B、渗沟
C、盲沟
D、渗井
查看答案

正确答案
C@#@D

试题解析

感兴趣题目
公路基本组成:路基、路面、桥梁、涵洞、()工程及各种()工程。
路基施工一般程序为()(其中①施工前准备工作;②路基基础处理;③路基土石方施工;④修建小型构筑物、排水沟、挡墙等;⑤路基工程质量的检查与验收等)。
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
路基工程应作为( )来施工。应将地基处理、路基填筑、基床表层、边坡防护、支挡结构、路基排水及沉降观测等作为系统工程施工,严格按照工程质量标准进行管理。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
背景材料: 东北平原某高速公路位于地下水丰富地区,为保证路基稳定,采用了多种排水设施如下:1、在填方路基边坡坡脚3m外设置浆砌片石排水沟;2、为降低地下水位,设置管式渗沟,并在长100m~300m管式渗沟末端设横向泄水管;3、低填方路段设边沟,当沟底纵坡大于3%时,采用浆砌片石铺砌加固。4、为避免高路堤边坡被路面水冲毁在路肩上设拦水缘石,在拦水带开口处设急流槽引离路基,与高路堤急流槽连接处设喇叭口。 问题: 1、该工程中采用的多种排水设施哪些属于排除地面水设施?除这些排除地面水设施外还有其它哪些设施? 2、为保证浆砌片石排水沟正常使用应在什么位置增设哪些设施? 3、管式渗沟的泄水管可用哪些材料?管式渗沟和填石渗沟能否互相替代?为什么?
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

以下属于路基边坡矿料防护设施的有
以下属于路基地面排水设施的有
根据《公路工程技术标准》,路基、路面排水设计除应综合规划、合理布局,并与沿线排灌系统相协调外,还要考虑()。
路基的基本形式与自然地面有何关系?路基的排水设备有哪些?
路基施工期间宜设置()性排水工程,以防降雨造成填土松软和路基边坡溜坍。
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
下列路基排水设施中,()是排除地面水的设施。
在路基工程防排水设计时,对路基有危害的地下水,应根据(),选用适宜的排除地下水设施。
写出以下运算符代表信义:AND(),OR()。
翻译:With Average or With Particular Average(WA or WPA)()
在高速公路路基工程建设中,路基排水要求严格,下列哪些措施符合工程要求()
矿用公路由路基、路面、()、路基排水、公路照明和公路标志六部分组成。
广告位招租WX:84302438

免费的网站请分享给朋友吧