首页/ 题库 / [单选题]1We have been prepar的答案

1We have been preparing our fighters to adjust themselves____civil society

单选题
2021-09-06 20:51
A、to
B、in
C、through
D、with
查看答案

正确答案
A

试题解析

感兴趣题目
The court may reduce or deny remuneration if it appears that the salvors have by their fault ()or have been guilty of theft,receiving stolen goods,or other acts of fraud.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Although goods have been lost or damaged whilst in the custody of the Shipowner,()not necessarily responsible,for his liability in respect of them may have been excluded by the rules of common law or by the express terms of the contract or by statute.
If dangerous goods have been thrown overboard by the Shipowner or the master,()can be made liable for their loss.
The Project Management Triangle is a model of the constraints of project management. These constraints have been listed scope (or quality), ( ), and cost
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
Enhanced procedures concerning the exercise of () have been developed to allow intervention in the ease of deficiencies deemed to pose a danger to persons, property or the environment.
Once vessel has been cleared by Port Health or Immigration ()must proceed to appropriate berth or anchorage.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
If we carry out our plan with()we will surely achieve our goal sooner or later.
Banks have no liability for any delay or loss caused by postal or telex failure.
Several links have been broken so th at for the next day or two, what was formerly a contiguous area 0 has been broken into two parts. However, both parts of area 0 have working links into area 1 using routers with RID 1.1.1.1 and 2.2.2.2. Which answers list the command on the router with RID 1.1.1.1 to create a virtual link to help solve this temporary problem?()
相关题目
Our success _______ whether everyone works hard or not.( )
Do you have relatives or friend there?
Prepare games or songs for a lesson is_____planning.
If we ________ adequate preparations, the conference wouldn’t have been so successful.
Social apps like QQ or WeChat have become our ________ for staying connected with friends.
If the operation()carefully prepared, it would not have been successful. 选项
Last week we bought some new ( ) or our new house at the seaside. 选项
Tina () have known the truth, or she would have told us. 选项
Please let us have $300 by September 30, 2004 or we shall_________ the case to our lawyer. 选项
"It would have been bad manners to make his guests feel foolish or uncomfortable" "Bad manners " means ________
1We have been preparing our fighters to adjust themselves____civil society
Tina _____ have known the truth, or she would have told us
阅读下面的句子并选择正确的汉语翻译。 目:1 Having a healthy snack on hand, like a granola bar or fruit can help your blood sugar levels and may provide a healthy boost of energy回答 2 Instead of sending an email to your co-worker, walk to her desk or just take the stairs today, even though youre tired回答 3 Moreover, these people may be friends or strangers — people of your own age, or people who are younger or older than you回答 4 People in different countries have different ideas of what sounds friendly, polite or sincere — and of what sounds rude or unfriendly!回答 选项:
He must have had an accident,or he()then.
If we carry out our plan with()we will surely achieve our goal sooner or later.
What would you like to have, meat or fish?()
If the operation __ carefully prepared, it would not have been successful.
She is very dear to us. We have been prepared to do it takes to save her life.
Apart from special circumstances,the value of the goods for which compensation must be made,if they have been lost or damaged,()that which they would have had at the time and place at which they ought to have been delivered in proper condition.
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
广告位招租WX:84302438

免费的网站请分享给朋友吧