首页/ 题库 / [单选题]创建结构柱,选项栏设置为F1,高度设置为的答案

创建结构柱,选项栏设置为F1,高度设置为未连接,输2500数值,创建该结构柱之后属性栏显示() (分数:2 分)

单选题
2021-09-06 21:04
A、底部标高为“F1”,底部偏移为“0”,顶部标高为“F1”,顶部偏移为“2500”
B、底部标高为“F1”,底部偏移为“-2500”,顶部标高为“F1”,顶部偏移为“0”
C、底部标高为“F1”,底部偏移为“2500”,顶部标高为“F1”,顶部偏移为“5000”
D、底部标高为“F1”,底部偏移为“2500”,顶部标高为“F1”,顶部偏移为“0”
查看答案

正确答案
A

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

在应用ORS液的过程中,错误的做法是()
在应用ORS液的过程中,错误的作法是()
在应用ORS液的过程中,错误的是()
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
某办公楼工程计划将BIM技术应用到该项目的结构设计中,并制定结构专业设计BIM应用实施流程路线如下: ①BIM软件直接创建BIM结构设计模型 ②将BIM结构模型导入结构计算软件 ③将经过结构计算分析软件计算分析后的结构模型导入BIM软件中 ④链接建筑、机电等专业的BIM模型,对结构专业的BIM模型进行校核 ⑤修改、调整结构计算模型,利用相关技术,使BIM结构模型与结构计算模型保持一致 ⑥经过调整后完成最终结构模型 ⑦提取结构构件工程量 ⑧绘制结构平面图,梁、板、柱配筋图,构件详图以及局部三维节点图 试列举两种结构计算分析软件?
建筑工程BIM技术应用中,有关BIM是指()。
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
口服补液及时纠正脱水,应用ORS,说法正确的是()
广告位招租WX:84302438

免费的网站请分享给朋友吧