首页/ 题库 / [单选题]对路堤填筑压实效果影响的最关键因素是的答案

对路堤填筑压实效果影响的最关键因素是

单选题
2021-09-06 21:22
A、土的类别
B、含水量
C、压实机具
D、压实方法
查看答案

正确答案
A

试题解析

感兴趣题目
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
()are liable to be stoten, pilfered or may damaged due to improper handing or stowage.
Banks have no liability for any delay or loss caused by postal or telex failure.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
背景材料: 某新建一级公路土方路基工程施工,该工程取土困难。K10+000~K12+000段路堤位于横坡陡于1:5的地面,施工方进行了挖台阶等地基处理,然后采用几种不同土体填料分层填筑路基,填筑至0~80cm,施工方选择细粒土,采用18t光轮压路机对土进行快速碾压时,碾压时直线段由中间向两边,曲线段由曲线的两边向中间,碾压一遍即结束。 碾压完成后检测了中线偏位、纵断高程、平整度、宽度,横坡和边坡坡度,认定土方路基施工质量合格,提请下一道工序开工。 问题: 1、对于挖台阶处的填筑具体应如何实施?在公路工程中有哪些情况需要进行挖台阶处理? 2、请从强度、水稳定性、透水性三个方面对不同土体填筑路堤施工提出要求。 3、试写出土方路堤机械化施工的程序。 4、影响土方路基质量最关键的因素是填料和压实,该工程的压实施工是否能有效控制质量?请指出问题所在并进行改正。 5、土方路基质量控制除了填料和压实的要求以外,还有什么其他质量控制关键点?6、现场质量控制检测一般包括哪几种,此处的现场质量控制的检测属于哪一种现场质量控制检测?依据材料中检测内容能否认定路基工程质量合格?请简述原因?
背景: 东方路桥公司中标承包了某高速公路工程后,组成了以公司副总经理为项目经理的项目经理部,下设技术部、材料部、合同部、财务部等。 1.技术部在对收集的施工技术资料、施工定额及概预算资料、施工组织管理工作的有关政策规定、环境保护规定、公司对该工程施工的有关规定进行分析的基础上,编制了路基工程、路面工程、桥梁工程的施工组织设计。 2.在路基工程的施工组织设计中,K0+000~K5+875段为填土路堤。采用水平分层填筑法施工,要求每层填料布料均匀,松铺厚度不超过50cm,施工程序为:取土→运输→推土机初平→压路机碾压→平地机整平。 3.K5+875~K10+950段路基为土石路堤,分层填筑,分层压实。经试验,该路段含石量在50%左右,按土石直接铺筑;松铺厚度控制在100cm以内,一直填筑到路堤设计标高。 4.为保证施工质量,对路基工程施工的质量控制关键点设置为: (1)施工放样与断面测量; (2)路基原地面处理; (3)路基横坡要满足要求; (4)分层填筑、分层压实 问题: 1.在编制施工组织设计前,技术部还应该收集哪些资料? 2.土方路基工程的施工组织设计中存在哪些问题? 3.该段土石路堤填筑存在哪些问题? 4.完善路基工程施工的质量控制关键点的内容。
影响路基压实效果的因素有哪些?简述各因素的对压实效果的影响。
背景材料: 东方路桥公司中标承包了某高速公路工程后,组成了以公司副总经理为项目经理的项目经理部,下设技术部、材料部、合同部、财务部等。 1.技术部在对收集的施工技术资料、施工定额及概预算资料、施工组织管理工作的有关政策规定、环境保护规定、公司对该工程施工的有关规定进行分析的基础上,编制了路基工程、路面工程、桥梁工程的施工组织设计。 2.在路基工程的施工组织设计中,填土路堤的施工方法采用水平分层填筑法,要求每层填料布料均匀,松铺厚度不超过50cm,施工程序为:取土→运输→推土机初平→压路机碾压→平地机整平。(项目管理内容和路基、路面、桥梁等结合在一起出题) 3.为保证施工质量,对路基工程施工的质量控制关键点设置为:(1)施工放样与断面测量;(2)路基原地面处理;(3)路基横坡要满足要求;(4)分层填筑、分层压实。 问题: 1.在编制施工组织设计前,技术部还应该收集哪些资料? 2.路基工程的施工组织设计中存在哪些问题? 3.完善路基工程施工的质量控制关键点的内容。
某大都市向东南发展,拟建一条路幅宽达92m、长7.6km的世纪大道。总承包商在全面分析该工程的有关资料后得到工程特点:工程质量要求高、工期紧、总报价较低,且工程位于丘陵地带,地形较复杂,当地有不少居民。为了保质保量的按合同要求完成任务,解决好以上矛盾,承包商认为最重要的是搞好项目施工组织设计的编制并能切实有效的执行。公司对该工程施工的有关规定进行分析的基础上,编制了路基工程、路面工程的施工组织设计。 在路基工程的施工组织设计中,填土路堤的施工方法采用水平分层填筑法,要求每层填料布料均匀,松铺厚度不超过30cm。不同土质混合填筑路堤时,以透水性较小的土填筑于路堤下层时,应做成5%的横坡。施工程序为:取土→运输→推土机初平→压路机碾压→平地机整平。 为保证施工质量,对路基工程施工的质量控制关键点设置为: (1)施工放样与断面测量; (2)路基原地面处理; (3)路基横坡要满足要求; (4)分层填筑、分层压实。 完善路基工程施工的质量控制关键点的内容。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

对路堤填筑压实效果影响的最关键因素是
路堤反压护道应与()路堤填筑,其填料、填筑压实方法、压实标准应符合一般地基路堤相应部位的规定。
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
试述路基工程的压实机理、影响压实的因素和压实指标。
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
广告位招租WX:84302438

免费的网站请分享给朋友吧