首页
题目
TAGS
首页
/
题库
/
[单选题]When is Halloween ce的答案
搜答案
When is Halloween celebrated
单选题
2021-09-08 14:39
A、1 October
B、31 October
C、25 December
D、1 January
查看答案
正确答案
B
试题解析
标签:
超星
西安科技大学
测绘工程
大学英语1
感兴趣题目
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
Is this()longer or shorter?
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
The () is used for hauling in or letting out the wires or ropes.
When loading or discharging dry mud or cement,crew members should use goggles and().
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
A mark or place at which a vessel comes under obligatory entry,transit,or escort procedure is know as().
The third officer’s duty is to()when vessel is commanded under the pilot or captain.
Damage to cargo caused by fumes or vapors from liquids,gases,or solids is known as().
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing
_____ed ucation is the instruction that occurs when the instructor and studen t s are separated by distance or time,or both.
1_____there is no rain,farming is difficult or impossible
1_____education is the instruction that occurs when the instructor and students are separated by distance or time,or both
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
When the Pilot is embarked he or she ().
When the pilot is embarked he or she().
Damage to cargo caused by fumes or vapor from liquids,gases, or solids is known as().
When rigging a bosun’s chair,a tail block or lizard is used to().
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
Traditionally, people gave Christmas gifts or money to their staff or servants on ()which is the day after Christmas.
翻译:With Average or With Particular Average(WA or WPA)()
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
广告位招租WX:84302438
题库考试答案搜索网
免费的网站请分享给朋友吧