首页/ 题库 / [问答题]蓄水式和泄水式沟头防护工程有何异同?的答案

蓄水式和泄水式沟头防护工程有何异同?

问答题
2021-12-27 16:16
查看答案

正确答案

异:两种沟头防护工程建设所需条件不同,当沟头上部集水区较少时可采用蓄水式沟头防护工程,而泄水式沟头防护工程一般在下列情况下考虑修建:一当沟头集水面积大且来水量多是,沟梗已不能有效的拦蓄径流二受侵蚀的沟头临近村镇威胁交通二无条件或不允许采用蓄水式沟头防护时,必须把径流导至集中地点通过泄水建筑物排泄入沟底,还要有消能设施以免冲刷沟底。
同:蓄水容量和泄水量都需根据沟头水文,地形条件及采水量而定。


试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

屋面防水工程蓄水试验的蓄水时间为()h。
蓄水式和泄水式沟头防护工程有何异同?
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
溢洪道是蓄水枢纽中的主要泄水建筑物。按布置位置的不同,可分为()与()两种形式。
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
什么是渗流?渗流与实际水流相比有何异同?研究渗流有何意义?
建筑工程内有防水要求的房间应进行蓄水试验,在地面蓄水时,蓄水深度为()
小学三个学段朗读目标各是什么?请你分析这三个学段朗读目标的异同。
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
广告位招租WX:84302438

免费的网站请分享给朋友吧