首页/ 题库 / [单选题]()is the operation t的答案

()is the operation to check the quantity, quality and package of the goods according to the contract and the specific standard.

单选题
2021-12-28 11:31
A、Inspection
B、Examination
C、Control
D、Test
查看答案

正确答案
A

试题解析

感兴趣题目
Currently the Pentium chip or(71), made by(72), is the most common CPU though there are many other companies that produce processors for personal computers. One example is the CPU made by Motorola which is used in Apple computers. With faster processors the clock speed becomes more important. Compared to some of the first computers which operated at below 30 megahertz((73))the Pentium chips began at 75 megahertz in the late 1990g. As of mid 2003 speeds now exceed 3000 + megahertz or 3 gigahertz(check your local computer store for the latest speed). It depends on the(74)that the chip is housed in, or the(75), as to whether you are able to upgrade to a faster chip. The motherboard contains the circuitry and connections that allow the various component to communicate with each other.
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
If the carrier is responsible for the damage or loss of the cargo,()will have to pay to the insurance company.
The goal, which they are unlikely to live to see , is tocure, prevent or manage all diseasesin the next 80or so years.
Whilst the engine is turning, check to see that no water is leaking into the crankcase, scavenge air belt, or from ().
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
The Shipowner must not stow goods on deck()there is a trade usage to that effect or the Charterer has given his express or implied consent.
() system is arranged to ensure that water can be drawn from any tank or the sea and discharged to any other tank or the sea as required to trim the vessel.
The third officer’s duty is to()when vessel is commanded under the pilot or captain.
相关题目
“To be or not to be----that is the question ” is taken from_______.
Travellers, when ____________ the checks, have to sign the checks in the presence of the bank or service clerks
()is the operation to check the quantity, quality and package of the goods according to the contract and the specific standard.
The payment proportionate to the part of the voyage accomplished or to the part of the cargo delivered is referred as().
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().

—                  

—  I mean the best way is using your own mobile phone or computer to operate it. 

If the carrier is responsible for the damage or loss of the cargo,()will have to pay to the insurance company.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
A feeler or thermal bulb is used for the expansion valve to ().
Traditionally, people gave Christmas gifts or money to their staff or servants on ()which is the day after Christmas.
Turbocharging system may be designed to operate on either the () or the constant pressure exhaust system.
The right to limit liability in connection with the ship()also extended to Charterers and any person interested in or in possession of the vessel and,in particular,any manager or operator of her.
The operation of which aids to navigation may be suspended during war or national emergency().
To safeguard the operator and other personnel working on or near a hoisting operation which of the following precautions should be observed?()
()is the Shipowner’s duty to send the ship to the agreed,or in the absence of special agreement,to the usual place of loading.
How is the Master or operator of a vessel required to keep the crew informed of the regulations concerning the discharging of garbage overboard?().
广告位招租WX:84302438

免费的网站请分享给朋友吧