首页/ 题库 / [单选题]普速铁路营业线施工中,繁忙干线封锁3小时的答案

普速铁路营业线施工中,繁忙干线封锁3小时及以上或影响全站(全场)信联闭4小时及以上的施工;干线封锁正线4小时及以上或影响全站(全场)信联闭6小时及以上施工;繁忙干线和干线其他换梁施工属于()。

单选题
2021-12-30 03:53
A、Ⅰ级施工
B、Ⅱ级施工
C、Ⅲ级施工
D、Ⅳ级施工
查看答案

正确答案
B

试题解析

感兴趣题目
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
()are liable to be stoten, pilfered or may damaged due to improper handing or stowage.
Banks have no liability for any delay or loss caused by postal or telex failure.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
《铁路营业线施工安全管理规定》要求,在铁路营业线路施工,施工单位要与设备管理单位和行车组织单位分别签定()。
所有在铁路营业线施工的作业人员应严格执行哪些铁路营业线施工安全纪律?
背景资料 某项铁路工程项目为营业线线路,根据实际地形还需设计桥涵、隧道等,下面就施工安全控制的有关内容提出以下问题 问题: 1、铁路营业线线路施工安全控制总体来说要注意哪些问题? 2、路堑工程施工安全控制应注意哪些问题? 3、对于小间距并行隧道施工的施工安全控制应注意哪些问题? 4、铺轨过程中应注意哪些安全问题? 5、临时道口的管理应注意哪些安全控制问题?
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

) 房屋建筑工程施工一级企业具有一级建造师应不少于( )人。
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
根据《注册建造师执业管理办法(试行)》规定,担任建设工程施工项目负责人的注册建造师对其签署的工程管理文件承担相应责任。注册建造师签章完整的工程施工管理文件方为有效。签章完整是指()
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
铁路营业线施工过程中发生妨碍或危及行车安全情况时,施工单位应该采取哪些措施?
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
广告位招租WX:84302438

免费的网站请分享给朋友吧