首页/ 题库 / [单选题]34. One of the requi的答案

34. One of the requirements for a fire is that the material ____ to its burning temperature.

单选题
2021-07-17 23:15
A、 is heated
B、 will be heated
C、be heated
D、would be heated
查看答案

正确答案
C

试题解析

标签:
感兴趣题目
The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understandin is reached on the meaning of the requirements. The result of this analysis and dialog is an ( )set of requirements.
The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result of this analysis and dialog is an(74)set of requirements.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
One of the main advantages of a graphite-furnace atomizer is that()
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of user and focus on user needs are called( ). Requirements written from the developer&39;s perspective and describe how the system will be implemented are called( ). Requirements evolve from detailed statemens of business capabilities that a system should have to detailed statements of the technical way in which the capabilities will be implemented in the new system. Requirements can be either functional or nofunctional in nature. For example, during the analysis phase of travel vehicles sales system, the system that must have the ability to search for available inventory is( ). The requirement that the system should be able to work on any Web browser belongs to( ). That customer personal information is protected in compliance with the Data Protection Act is a requirement of( ).
The lubricating system for the cylinder walls is different from the bearings in that the oil for former one is supplied in () while that for latter one is ().
The PassGuide network consists of a series of routers that are all configured for IBGP. Which one of the following IBGP characteristics is true()
One of the requirements for a general average act is().
What is NOT a requirement of the reinspection for a tank barge with a certificate of inspection valid for two years? ()
One of the biggest worries for governments is that the longer people live,the more likelihood there is for diseases and for disability(残疾 ).
The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycleIt is().
Refer to the following architectures, which one is able to supply a core infrastructure so that customers can capitalize quickly with the change of business requirements?()
相关题目
34. One of the requirements for a fire is that the material ____ to its burning temperature.
34. One of the requirements for a fire is that the material ____ to its burning temperature.
The______scheme in a database system is responsible for the detection of failures and for the restoration of the database to a state that existed before the occurrence of the failure.
● The (74) scheme in a database system is responsible for the detection of failures and for the restoration of the database to a state that existed before the occurrence of the failure.(74)
One of the benefits of the new model is that it is easier_____than the old one
What is required in addition to the heat,fuel,and oxygen of the fire triangle to have a fire?()
If the scavenge fire is of a more major nature, if there is a risk of the fire extending or if the scavenge trunk is adjacent to the crankcase with risk of a hot spot developing it sometimes becomes necessary to ()the engine.
One of the things that make Fiji a tourist attraction is
The main advantage of a Chinese stopper over the one line stopper is that it().
A vessel sounding a fog signal of one short,one prolonged,and one short blast is indicating that the vessel is().
One of the benefits of the new model is that it is easier()than the old one.
Your vessel is equipped with a fixed CO2 system and a fire main system. In the event of an electrical fire in the engine room what is the correct procedure for fighting the fire?()
Your vessel is equipped with a fixed C02 system and a fire main system. In the event of an electrical fire in the engine room what is the correct procedure for fighting the fire?().
The MOST important feature of the material used for making the binnacle of a standard magnetic compass is that it is().
A circuit that has one wire in contact with the hull of the ship is a()
The class of fire on which a blanketing effect is essential to extinguish the fire is ().
During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised ( )are necessary.
● During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised (75)are necessary.(75)
During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised(75)are necessary.

The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result ofthis analysis and dialog is an()set of requirements.

广告位招租WX:84302438

免费的网站请分享给朋友吧