Compliance with the terms of the load line certificate on a ship is the responsibility of the().

单选题
2021-12-31 18:35
A、Ballast Control Operator
B、Barge Supervisor
C、Master or Offshore Installation Manager
D、operators representative
查看答案

正确答案
C

试题解析

标签: 船舶舱室名称
感兴趣题目
Notice of readingness to load must be served()the charterer or his agent.
Notice of Readiness to Load must be served()the Charterer or his agent.
()is the Shipowner’s duty to send the ship to the agreed,or in the absence of special agreement,to the usual place of loading.
Charging is the filling of the engine cylinder with a supply or charge of fresh air () compression.
The amount of fuel delivered for each cycle must be in accordance with the engine load, and the same quantity of fuel must be delivered to each cylinder for each power stroke at that load.Which of the following statements describes this requirement?()
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited()the terms of the contract or the statute.
Which of the following shows the proper pronunciation of “whose” in the sentence “In American,Li stayed in a family whose landlady could help him with his English”?
In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
It’s a configuration that experts are calling a "firewall sandwich," with the second firewall providinga second level of load balancing after traffic down. What is meant by the term "firewall sandwich"?()
If the pattern of the terms 3continues, which of the following would be the sixth term of the sequence?
相关题目

When the seller pays for all charges up to an including the loading of a consignment on board the carrying vessel, the term is ().

The term communicative competence ___ chomsky’s term linguistic competence, the latter meaning knowledge of the language system, or grammatical knowledge in other words.
Compliance with the terms of the load line certificate on a ship is the responsibility of the().
Compliance with the terms of the load line certificate on a vessel is the responsibility of the().
() management includes negotiating the terms and conditions in contracts and ensuring compliance with. the terms and conditions, as well as documenting and agreeing on any changes or amendments that may arise during its implementation or execution.
management includes negotiating the terms and conditions in contracts and ensuring compliance with the terms and conditions,as well as documenting and agreeing on any changes or amendments that may arise during its implementation or execution
The bill of lading cannot vary or add to the terms of the charter-party unless it()an express provision to that effect.
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
The loading of the ship must be done in accordance with().
The Charterer is entitled to the benefit of the excepted perils during the transit of the goods from storing place to the actual place of loading,provided such transit substantially ()part of the operation of loading.
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited by the terms of().
If a vessel of special construction cannot fully comply with the Rules,her degree of compliance shall be determined by().
Lay days()to commence after the expiry of a specified time after the giving of the notice of readiness to load or discharge.
Sea water temporarily pumped into tanks to simulate the increased vertical loading of environmental forces is termed().
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
()means a document which evidences a contract of carriage by sea and the taking over or loading of the goods by the carrier,and by which the carrier under takes to deliver the goods against surround of the document.
Although goods have been lost or damaged whilst in the custody of the Shipowner,()not necessarily responsible,for his liability in respect of them may have been excluded by the rules of common law or by the express terms of the contract or by statute.
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
The()provides a rapid means of tallying when items of the same commodity are being loaded or unloaded in uniform drafts consisting of an equal number of pieces.
When the renewal verification is completed more than three months before the expiry date of the existing Document of Compliance or Safety Management Certificate, the new Document of Compliance or the new Safety Management Certificate should be valid from the date of () for a period not exceeding five years.