Which tasks can be accomplished using the DBMS_LOB. SETOPTIONS procedure?()
()involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application area.
A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches.
Which of the following must you do to accomplish this?()
免费的网站请分享给朋友吧