首页/ 题库 / [单选题]The record of tests 的答案

The record of tests and inspection of fire fighting equipment on board a ship must include().

单选题
2022-01-01 12:36
A、the name of the person conducting the test
B、the weight of the charge
C、recommendations for the next test
D、All of the above
查看答案

正确答案
A

试题解析

标签: 应急部署
感兴趣题目
In the case of any actual or apprehended loss or damage the carrier and receiver must()all reasonable facilities to each other for inspecting and tallying the goods.
Which action is routinely performed at the annual servicing and inspection of a dry-chemical cartridge-operated portable fire extinguisher?()
Which action is routinely performed at the annual servicing and inspection of a dry-chemical cartridge-operated portable fire extinguisher?()
How long must the records of tests and inspections of fire fighting equipment on board a ship be retained on board?()
Weight is considered during the periodic required inspection and servicing of().
The records of ship security training, drills and exercises shall be kept in the working language or languages of the shipIf the language or languages used are not(), a translation into one of these languages shall be included.
The objectives of()are to ensure safety at sea, prevention of human injury or loss of life, and avoidance of damage to the environment,in particular to the marine environment and to property.
If the scavenge fire is of a more major nature, if there is a risk of the fire extending or if the scavenge trunk is adjacent to the crankcase with risk of a hot spot developing it sometimes becomes necessary to ()the engine.
If the insufficiency of the packing was apparent on reasonable inspection,the Shipowner cannot()the exception of insufficiency of packing.
Perform Quality Control is the process of monitoring and recording results of executing the Quality Plan activities to assess performance and recommend necessary changes.( ) are the techniques and tools in performing quality control.
①Activity network diagram ②Cause and effect diagrams ③Inspection④Flow chart⑤Work Breakdown Structure ⑥Pareto chart
When an azimuth of the Sun has been taken and the deviation of the standard magnetic compass computed,the watch officer should record the results().
When an azimuth of the Sun has been taken and the deviation of the standard magnetic compass computed,the watch officer should record the results().
相关题目
The attitudes or emotion of a language user in choosing a word and the influence of these on the listener or reader’s interpretation of the word form ___ of a word.
all inspections are carried ( )conscientiously to the best of our knowledge and ability.
Your vessel has completed an inspection for certification and is issued a Temporary Certificate of Inspection. The Temporary Certificate().
What is required in addition to the heat,fuel,and oxygen of the fire triangle to have a fire?()
If the scavenge fire is of a more major nature, if there is a risk of the fire extending or if the scavenge trunk is adjacent to the crankcase with risk of a hot spot developing it sometimes becomes necessary to ()the engine.
I believe that only in the purifying fire of sacrifice()and the greatness of human soul().
The record of tests and inspection of fire fighting equipment on board a ship must include().
A record of the types and strengths of steels used on a ship must be included in the().
Software engineers apply the principles of software engineering to the design, development, ( ),testing, and evaluation of the software and systems that make computers or anything containing software work.
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
( )refers to the process of testing and then eliminating errors.
● XP is (1)of interesting twists that encourage one to think -- for example, how about "Test and then code"? I’ve worked with software companies and a few IT organizations in (2)programmer performance was measured on lines of code delivered and testing was measured on defects found ---- (3)side was motivated to reduce the number of defects prior to testing. XP uses two types of testing: unit and functional.(4), the practice for unit testing involves developing the test for the feature prior to writing the code and further states that the tests should be automated. Once the code is written, it is immediately (5)to the test suite bringing instant feedback.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
When latitude and longitude are used,these shall be expressed in()(and decimals of a minute if necessary),north or south of the Equator and east or west of Greenwich.
The Master or person in charge of a ship shall ensure the crane record book shows the().
The cubic inch(or liter) displacement of a cylinder is determined by the diameter of the piston and the ()
Weight is considered during the periodic required inspection and servicing of().
Where must the 0mster or person in charge of a ship record the date of each test of emergency lighting and power systems and the condition and performance of the equipment?()
Where must the master or person in charge of a ship record the date of each test of emergency lighting and power systems and the condition and performance of the equipment().
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
广告位招租WX:84302438

免费的网站请分享给朋友吧