The inputs of developing project management plan do not include()

单选题
2022-01-01 12:36
A、project charter
B、stakeholder management strategy
C、project scope statement
D、outputs from planning processes
查看答案

正确答案
B

试题解析
中文解释:制定项目管理计划的输入不包括A.项目章程B.干系人管理策略C.项目范围说明书D.计划过程输出

感兴趣题目
The court may reduce or deny remuneration if it appears that the salvors have by their fault ()or have been guilty of theft,receiving stolen goods,or other acts of fraud.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Although goods have been lost or damaged whilst in the custody of the Shipowner,()not necessarily responsible,for his liability in respect of them may have been excluded by the rules of common law or by the express terms of the contract or by statute.
The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.
Developed countries, like the US, have moved the some manufactures to the developing countries. Is it true or not? ()
Enhanced procedures concerning the exercise of () have been developed to allow intervention in the ease of deficiencies deemed to pose a danger to persons, property or the environment.
The master may bind the Shipowner or Charterer()doing such things as are necessary on the part of the one or of the other to carry out the contract.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
相关题目

You can _____ some bottles of wine, or some chocolates, or a bunch of flowers.

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

A/An__language test,such as IELTS or TOEFL,is developed on the basis of a fixed standard.
A / An _ language test, such as IELTS or TOEFL, is developed on the basis of a fixed standard.
The attitudes or emotion of a language user in choosing a word and the influence of these on the listener or reader’s interpretation of the word form ___ of a word.
The form of the bullet screen triggers the social attribute of the movie, and the prospect of developing the screen technology or form for the movie is broad
An output device, such as a keyboard or mouse, gathers input and transforms it into a series of electronic signals for the computer
Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
The inputs of developing project management plan do not include ( ).

The inputs of developing project management plan do not include()

The inputs of developing project management plan do not include (72) .
● The inputs of developing project management plan do not include (72).(72)
Developed countries, like the US, have moved the some manufactures to the developing countries. Is it true or not? ()
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
Software engineers apply the principles of software engineering to the design, development, ( ),testing, and evaluation of the software and systems that make computers or anything containing software work.
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
广告位招租WX:84302438

免费的网站请分享给朋友吧