( )is not the ad的答案

( )is not the advantage of GERT (Graphical evaluation and review techniques)as compared with PERT (project evaluation and review techniques).
 

单选题
2022-01-01 17:17
A、Allowing looping
B、Allowing for dummy tasks
C、Allowing branching
D、Allowing multiple project end results
查看答案

正确答案
B

试题解析

相关题目

It is the ability to do the job ______ matters not where you come from or what you are.

The point is not who said the words, _____ they are true or not.
“To be or not to be----that is the question ” is taken from_______.
Now almost all the parents want their children to learn the piano or the violin, _____ their children are willing or not.( )
__________ is the act performed by or resulting from saying something; it is the consequence of, or the change brought about by the utterance.
Money is the key ________for me to decide whether I will take the job or not.
综合布线系统工程验收项目内容为()、电缆与光缆布放(楼内、外)、缆线终端、系统测试、工程总验收。
Does it always matter if the “real world” is not being practiced in the classroom? Why or why not?
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
is not a peripheral component or device. The basic input device on a small computer is a(71).
Developed countries, like the US, have moved the some manufactures to the developing countries. Is it true or not? ()
The () is not properly set thus causing either advanced or retarded firing.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
The international transport and the international logistics are same. Is it correct or not? ()
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.

Project selection methods involve measuring value or attractiveness to the project owner or sponsor and may include other organizational decision criteria ()is not a project selection method.

Project selection methods involve measuring value or attractiveness to the project owner or sponsor and may include other organizational decision criteria. ( )is not a project selection method.
The () is not properly set thus causing either advanced or retarded firing.
广告位招租WX:84302438

免费的网站请分享给朋友吧