首页/ 题库 / [单选题]The majority of carg的答案

The majority of cargo gear breakdowns are a result of().

单选题
2022-01-05 18:19
A、guy failures
B、topping lift failures
C、bending of the boom from compression
D、gooseneck failure
查看答案

正确答案
A

试题解析

感兴趣题目
One of the most common causes of reduction gear failure is gear wear caused by scoring as a result of
If the carrier is responsible for the damage or loss of the cargo,()will have to pay to the insurance company.
The partial loss of or damage to the cargo is not recoverable from the insurer resulting from natural calamities under()in PICC Ocean Marine Cargo Clauses.
The total quantity of oil discharge into the sea()for existing tankers 1/15000 of the total quantity of the particular cargo or which the residue formed a part().
In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.
The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
Chemical Tankers are generally referred to the cargo ships constructed or adapted and used for the carriage of().
The internal volume of a cargo hold measured from the inside faces of the cargo battens,the lower side of the deck beams,and the top of the tank top ceiling is known as the().
The tallying of cargo refers to such kind of work that the amount and condition of all cargo should be checked().
Battens are fitted in cargo holds across the frames of the vessel from the turn of the bilge upward. The purpose of these cargo battens is().
Battens are fitted in cargo holds across the frames of the vessel from the turn of the bilge upward. The purpose of these cargo battens is().
相关题目
Which of the following British cities is one of the major financial centres of the world?
The payment proportionate to the part of the voyage accomplished or to the part of the cargo delivered is referred as().
An advantage of a helical gear pump over a simple gear pump is that the helical gear pump is capable of ().
In the cargo winch, spur reduction gearing transfers the motor drive to ().
The majority of medium speed and high speed marine diesel engines for main or auxiliary drive operate on the () cycle.
When the dew point of the outside air is lower than or equal to the dew point of the air in the cargo hold,you should().
If the carrier is responsible for the damage or loss of the cargo,()will have to pay to the insurance company.
All the cargo holds must be()cleaned out()meet the requirement of the cargo surveyor.
After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or().
The majority of cargo gear breakdowns are a result of().
The majority of cargo gear breakdowns are a result of().
Even if the Shipowner is liable for the loss of or damage to the goods whilst in his custody,his()may have been limited by a clause in the contract or by statute,so that the owner of the cargo will be unable to recover the full amount of his loss.
The necessity of the segregation of cargoes is determined by().
When carrying a cargo of asphalt or molten sulfur,which are carried at temperatures of over 300°F,one of the biggest dangers is().
Wear occurring at the tips of the reduction gear teeth is usually the result of ().
Mechanical gearing of deck machinery such as the windlass or boat hoists should().
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire most likely to be mentioned?().
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire mostlikely to be mentioned?().
For a given weight of cargo,the stress on the heel block of a cargo boom().
The majority of automatic mooring winches are spur geared to improve the backward efficiency of the gear train for rendering()
广告位招租WX:84302438

免费的网站请分享给朋友吧