首页/ 题库 / [单选题]The premier and the 的答案

The premier and the visiting foreign minister had a talk in _____ friendly atmosphere.

单选题
2022-03-12 20:33
A、a most
B、most
C、very
D、the very
查看答案

正确答案
A

试题解析

本题考查的是most的用法,此处为副词,表示“非常”,后面要加形容词。而且不是最高级,前面用不定冠词即可,故选A。用very修饰也用不定冠词,不该用定冠词the。


感兴趣题目
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
In the case of any actual or apprehended loss or damage the carrier and receiver must()all reasonable facilities to each other for inspecting and tallying the goods.
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
The schedule management plan is a component of the project management plan. The Schedule management plan maybe formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
The schedule management plan is a component of the project management plan The schedule management plan may be formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
Sometimes lights are()by fog,haze,dust,smoke,or precipitation which may be present at the light,or between the light and the observer,and which is possibly unknown by the observer.
Should it appear that war or blockade would prevent the vessel from safely reaching the port of destination and / or discharging the goods thereat,the Carrier().
相关题目
_____ed ucation is the instruction that occurs when the instructor and studen t s are separated by distance or time,or both.
The attitudes or emotion of a language user in choosing a word and the influence of these on the listener or reader’s interpretation of the word form ___ of a word.
1_____education is the instruction that occurs when the instructor and students are separated by distance or time,or both
() management includes negotiating the terms and conditions in contracts and ensuring compliance with. the terms and conditions, as well as documenting and agreeing on any changes or amendments that may arise during its implementation or execution.
management includes negotiating the terms and conditions in contracts and ensuring compliance with the terms and conditions,as well as documenting and agreeing on any changes or amendments that may arise during its implementation or execution
Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
The quantity or condition which is measured and controlled is known as the ()
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
The international transport and the international logistics are same. Is it correct or not? ()
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
()is the distance east or west measured in degrees,minutes and seconds of arc on the equator between the prime meridian and the meridian passing through the place.
The right to limit liability in connection with the ship()also extended to Charterers and any person interested in or in possession of the vessel and,in particular,any manager or operator of her.
:不管外界对大学英语四、六级考试有怎样的非议,每年的四、六级考试还是_________地进行着,不少高校的学位证书仍然与大学英语四、六级考试挂钩着,大学英语四、六级考试成绩依然神气着……当大学英语四、六级考试_________成只为一纸证书考试时,大学英语四、六级考试就已经变得_________了。 填入画横线部分最恰当的一项是( )。
不管外界对大学英语四、六级考试有怎样的非议,每年的四、六级考试还是________地进行着,不少高校的学位证书仍然与大学英语四、六级考试挂钩着,大学英语四、六级考试成绩依然神气着……当大学英语四、六级考试________成只为一纸证书考试时,大学英语四、六级考试就已经变得________了。填入划横线部分最恰当的一项是( )。
大学英语(一)(二)(三)(四)课程考核和全国高等学校英语应用能力考试(A级)成绩以百分制记载,()分为合格。全国大学生英语等级考试以710分制记载,()分为合格。
假设参加计算机等级考试的学生关系R,参加英语等级考试的学生关系S。求既参加了计算机考试又参加了英语考试的学生,应当进行下列()。
The cubic inch(or liter) displacement of a cylinder is determined by the diameter of the piston and the ()
The premier and the visiting foreign minister had a talk in _____ friendly atmosphere.
广告位招租WX:84302438

免费的网站请分享给朋友吧