首页/ 题库 / [单选题]From()the informatio的答案

From()the information concerning the tons per inch or centimeter immersion of a vessel shall be usually found.

单选题
2022-05-21 10:46
A、Stability curve
B、Deadweight scale
C、Table of Azimuth
D、Freeboard assignment
查看答案

正确答案
B

试题解析

感兴趣题目
From()the information concerning the tons per inch or centimeter immersion of a vessel shall be usually found.
From()the information concerning the tons per inch or centimeter immersion of a vessel shall be usually found.
The movement of water away from the shore or downstream is called a(n)().
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
The schedule management plan is a component of the project management plan. The Schedule management plan maybe formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
The schedule management plan is a component of the project management plan The schedule management plan may be formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
() system is arranged to ensure that water can be drawn from any tank or the sea and discharged to any other tank or the sea as required to trim the vessel.
Should it appear that war or blockade would prevent the vessel from safely reaching the port of destination and / or discharging the goods thereat,the Carrier().
相关题目
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
_________ in a person’s speech or writing usually ranges on a continuum from casual or colloquial to formal or polite according to the type of communicative situation.
__________ is the act performed by or resulting from saying something; it is the consequence of, or the change brought about by the utterance.
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
()act is the act performed by or resulting from saying something.
The lower-level classes (known as subclasses or derived classes) ( ) state and behavior from the higher-level class (known as a super class or base class).
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
In time charter-party,()is to indemnify the owners against all consequences or liabilities arising from the master signing bills of lading or otherwise complying with such orders.
Data items are added or deleted from the list only at the top of the______.
● Data items are added or deleted from the list only at the top of the (72) .(72)
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
The objective of information ( ) includes protection of information and property from theft,corruption,or natural disaster,while allowing the information and property to remain accessible and productive to its intended users.
Water in the fuel can prevent the engine from starting, prevent it from developing full power, or ()
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
How is the Master or operator of a vessel required to keep the crew informed of the regulations concerning the discharging of garbage overboard?().
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
It will be a relief over the death of a friend or a relative if the friend or relative dies from ______.
From()the information concerning the tons per inch or centimeter immersion of a vessel shall be usually found.
广告位招租WX:84302438

免费的网站请分享给朋友吧