首页/ 题库 / [单选题]The company is looki的答案

The company is looking for computer experts ______ have 10 years of experience in software management.

单选题
2022-06-23 03:20
A、who
B、if
C、because
D、he
查看答案

正确答案
A

试题解析

句意:这家公司正在寻找一些拥有十年软件管理经验的计算机专家。空格处引导定语从句,且先行词表示人,因此选择A。

相关题目
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
__________ is the act performed by or resulting from saying something; it is the consequence of, or the change brought about by the utterance.
In what way is the market very real for each person or businessman who is making and selling something ( )
It is usually decided by the()terms whether the shipper or the consignee pays for the cargo insurance.
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
()may be laid ready for the cargo or may just be put in bundles ready for the stevedores to lay out as the cargo is loaded.
If the carrier is responsible for the damage or loss of the cargo,()will have to pay to the insurance company.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
The purpose for the bag or box on top of some survival craft is to().
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
A ship is responsible for the cargo loaded or unloaded().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
A feeler or thermal bulb is used for the expansion valve to ().
The reason for making a decision is that a problem exists, or something is standing ______the way of accomplishing them.
What is the default value for the ENABLED attribute of a job or program when it is created? ()
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
According to SOLAS, 1974, as amended, the shipowner or any person who has assumed responsibility for the ship (the “Company”) must()
广告位招租WX:84302438

免费的网站请分享给朋友吧