首页/ 题库 / [多选题]施工过程中防止深基坑土体回弹变形过大的有的答案

施工过程中防止深基坑土体回弹变形过大的有效措施有()。

多选题
2022-06-29 13:16
A、基底暴露晾晒
B、保证坑底井点降水正常
C、防止地基土浸水
D、尽快浇筑垫层和底板
E、对基础下部土层进行加固
查看答案

正确答案
B | C | D | E

试题解析

感兴趣题目
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
施工中减少基坑回弹变形的有效措施是()。
施工过程中防止深基坑土体回弹变形过大的有效措施有()。
支护结构失效、土体过大变形对基坑周边环境或主体结构施工安全的影响分为()、严重、不严重。
基坑开挖与支护设计应包括的内容为()。Ⅰ.支护体系方案的技术经济比较和选型Ⅱ.支护结构的强度,变形和稳定性验算Ⅲ.基坑内外土体的稳定性验算Ⅳ.基坑降水或止水帷幕设计及维护墙的抗渗设计Ⅴ.基坑开挖与地下水位变化引起的在坑内外土体的变形及其对基础桩,邻近建筑物和周边环境的影响Ⅵ.基坑开挖施工方法的可行性及基坑施工过程中的监测要求()
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

深基坑施工中,以提高土体的强度和土体的侧向抗力为主要目的地基加固处理方法有()。
在应用ORS液的过程中,错误的做法是()
施工过程中减少基坑回弹变形的有效措施有()。
在应用ORS液的过程中,错误的作法是()
深基坑工程施工过程中,应设置验收控制点应包括()。
在应用ORS液的过程中,错误的是()
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
基坑侧壁安全等级一级的破坏后果是支护结构破坏、土体失稳或过大变形对基坑周边环境及地下结构施工影响不严重。
支护结构破坏、土体失稳或过大变形对基坑周边环境及地下结构施工影响(),则基坑侧壁安全等级定为一级。
支护结构破坏、土体失稳或过大变形对基坑周边环境及地下结构施工影响( ),则基坑侧壁安全等级定为一级。
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().