首页/ 题库 / [单选题]Course directed by t的答案

Course directed by the OSC or CSS to be steered at the beginning of a search is().

单选题
2022-07-11 17:34
A、Original course
B、Initial course
C、Final course
D、Designated course
查看答案

正确答案
B

试题解析

标签: 搜索用语
感兴趣题目
Goods should not be dispatched direct to the address of a bank or consigned to a bank without prior agreement on the part of that bank.
Duty is an act or a course of action that people __________you to take by social customs, law or religion.
Duty is an act or a course of action that people ______you to take by social customs, law or religion.
()anything provided for in Clause 7 and 8 of this bill of lading and subject to Clause 17,if it can be proved where the loss or damage occurred the carrier and the merchant shall,as to the liability of the carrier,be entitled to require such liability to be determined by the provisions contained in any relevant international convention or national law.
The“person in the phrase ”to designate a person or persons ashore having direct access to the highest level of management” refers to ().
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited()the terms of the contract or the statute.
The bill of lading serves as a document of title enabling the goods to be transferred from the shipper to the consignee or any other party by endorsement.The()can not be transferred to the third parties by endorsement.
Course directed by the OSC or CSS to be steered at the beginning of a search is().
Course directed by the OSC or CSS to be steered at the beginning of a search is().
Course directed by the 0SC or CSS to be steered at the beginning of a search is().
Sometimes lights are()by fog,haze,dust,smoke,or precipitation which may be present at the light,or between the light and the observer,and which is possibly unknown by the observer.
Any alteration of course and/or speed to avoid collision shall,if the circumstances of the case admit,()to another vessel observing visually or by radar.
相关题目
“To be, or not to be - that is the question;/Whether’ tis nobler in the mind to suffer / The slings and arrows of outrageous fortune,/Or to take arms against a sea of troubles ,/And by opposing end then?” These lines are taken from ______.

()involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application area.

The word “critical” in the sentence “This is a critical period as any loss of propulsion, or steering, can lead to collision, grounding, or other damage to the ship” can be best replaced by ().
The maritime labour certificate shall be issued to()by the competent authority,or by a recognized organization duly authorized for this purpose.
In the northern hemisphere, the largest waves or swells created by a typhoon or hurricane will be located().
When a vessel sees the other ahead or nearly ahead,by night she could see the masthead lights of the other in a line or nearly in a line or both side lights,()shall be deemed to exist.
Inquiries()the condition of the patients may be made personally or by telephone.
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited by the terms of().
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
If the Charterer loads or discharges the vessel in a shorter time than is allowed to him by the lay days,he may be entitled to().
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
Even if the Shipowner is liable for the loss of or damage to the goods whilst in his custody,his()may have been limited by a clause in the contract or by statute,so that the owner of the cargo will be unable to recover the full amount of his loss.
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
It is abnormal that when the engine is being turned by the turning gear or by hand, ().
Routers perform the decision process that selects what path a packet takes. These ( ) layer devices participate it the collection and distribution of network-layer information, and perform Layer 3 switching based on the contents of the network layer ( ) of each packet. You can connect the routers directly by point-to-point ( ) or local-area networks, or you can connect them by LAN or WAN switches. These Layer 2 switches unfortunately do not have the capability to hold Layer 3 ( ) information or to select the path taken by a packet through analysis of its Layer 3 destination address. Thus, Layer 2 switches be involved in the Layer 3 packet ( ) decision process.
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
广告位招租WX:84302438

免费的网站请分享给朋友吧