首页/ 题库 / [单选题]The carrier has,befo的答案

The carrier has,before and at the beginning of the voyage,to()due diligence to make the ship seaworthy.

单选题
2022-07-11 17:35
A、pay
B、export
C、import
D、exercise
查看答案

正确答案
D

试题解析

标签: 海商法 经济学
感兴趣题目
If there is a strike or lock-out affecting the cargo on or after vessel’s arrival at port of discharge and the same has not been settled within 48 hours,Receivers shall have the option of keeping vessel waiting until such strike or lock-out is at an end against paying half demurrage after expiration of the time prescribed for discharging or ordering the vessel to a substituting port.The “same” refers to().
If the carrier and the shipper have agreed that the goods shall or may be carried on deck,the carrier must()in the bill of lading a statement to that effect.
The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.
()anything provided for in Clause 7 and 8 of this bill of lading and subject to Clause 17,if it can be proved where the loss or damage occurred the carrier and the merchant shall,as to the liability of the carrier,be entitled to require such liability to be determined by the provisions contained in any relevant international convention or national law.
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited()the terms of the contract or the statute.
In the case of any actual or apprehended loss or damage the carrier and receiver must()all reasonable facilities to each other for inspecting and tallying the goods.
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The carrier has,before and at the beginning of the voyage,to()due diligence to make the ship seaworthy.
Sometimes lights are()by fog,haze,dust,smoke,or precipitation which may be present at the light,or between the light and the observer,and which is possibly unknown by the observer.
Should it appear that war or blockade would prevent the vessel from safely reaching the port of destination and / or discharging the goods thereat,the Carrier().
相关题目
The shipment time is June or July at our __ and the goods will be shipped in one __
If the goods is damaged or lost in the process of logistics, the shipper can()to the carrier.
Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
The defences and limits of liability()in this bill of lading shall apply in any action against the carrier for loss of or damage to the goods whether the action be founded in contract or in tort.
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
The port State control officer or the surveyor authorized by the port State Administration must be aware that()may be carried on product carriers.
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
The certificate of a Lloyd’s surveyor()likely to be accepted by the court as conclusive to show that the carrier has exercised due diligence when it relates to a case in which he has built or bought a vessel in the first instance.
A common rail engine has only one or two high pressure pumps in operation at the same()time, and the injection into each cylinder.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Assuming you build networks to exact specifications, what is the recommended maximum length a 10BaseT cable can be before it has to be segmented or repeated?()
Assuming you build networks to exact specifications, what is the recommended maximum length a 10BaseT cable can be before it has to be segmented or repeated?
After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or().
Keeping the draft at or below the load line mark will insure that the vessel has adequate().
()means a document which evidences a contract of carriage by sea and the taking over or loading of the goods by the carrier,and by which the carrier under takes to deliver the goods against surround of the document.
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
广告位招租WX:84302438

免费的网站请分享给朋友吧