首页/ 题库 / [单选题]The pivoting point o的答案

The pivoting point of a fully loaded vessel with normal trim proceeding ahead at sea speed is().

单选题
2022-07-14 10:41
A、right at the bow
B、one-third the length of the vessel from the bow
C、one-half the length of the vessel from the bow
D、two-thirds the length of the vessel from the bow
查看答案

正确答案
B

试题解析

感兴趣题目
When a teacher intends to present or explain a new language point, which of the following grouping methods is mostly recommended?
When a teacher intends to present or explain a new language point,which of the following grouping methods is mostly recommended?
The flash point of a liquid refers to the temperature ()
()is the Shipowner’s duty to send the ship to the agreed,or in the absence of special agreement,to the usual place of loading.
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
When a ship is fully loaded, it needs to prevent the main engine to be().While a ship is fully empty, it needs to prevent the main engine to be().
In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.
Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in th eload’s().
The center of flotation of a vessel is the point in the waterplane().
When underway and proceeding ahead,as the speed increases,the pivot point tends to().
The pivoting point of a fully loaded vessel with normal trim proceeding ahead at sea speed is().
Line segment AB is a diameter of circle O. If the coordinates of O are(2, -1)and the coordinates of point A are (-1, -2), what are the coordinates of point B?
相关题目
The path that a vessel is expected to follow,represented on a chart by a line drawn from the point of departure to the point of arrival,is the().
The attitudes or emotion of a language user in choosing a word and the influence of these on the listener or reader’s interpretation of the word form ___ of a word.
According to Hedge, a connotative meaning of a word refers to ‘the ___ or emotions of a language user in choosing a word and the influence of these on the listener’s or reader’s ___ of the word’
Compliance with the terms of the load line certificate on a ship is the responsibility of the().
Compliance with the terms of the load line certificate on a vessel is the responsibility of the().
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
When the dew point of the outside air is lower than or equal to the dew point of the air in the cargo hold,you should().
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Lay days()to commence after the expiry of a specified time after the giving of the notice of readiness to load or discharge.
A ship is responsible for the cargo loaded or unloaded().
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
()means a document which evidences a contract of carriage by sea and the taking over or loading of the goods by the carrier,and by which the carrier under takes to deliver the goods against surround of the document.
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
When backing down with sternway,the pivot point of a vessel is().
Which of the valves listed should be used either in the fully opened or the fully closed position?()
The()provides a rapid means of tallying when items of the same commodity are being loaded or unloaded in uniform drafts consisting of an equal number of pieces.
The displacement of a ship is to the total weight, all told, of the relevant loaded ship()
Which of the following actions are stated in the correct order prior to loading or discharging cargo on a Ro-Ro vessel? ()
Notice of readingness to load must be served()the charterer or his agent.
Notice of Readiness to Load must be served()the Charterer or his agent.
广告位招租WX:84302438

免费的网站请分享给朋友吧