首页/ 题库 / [单选题]]If a charter-party,的答案

]If a charter-party,although for two consecutive voyages,is held to be one indivisible contract,a deviation on the first voyage entitles the Charterer to treat the breach as a repudiation of()contract.

单选题
2023-03-05 19:17
A、a part of
B、the whole
C、3/4th of
D、1/2nd of
查看答案

正确答案
B

试题解析

标签: 海商法 经济学
感兴趣题目
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)
The FEC mode is for()from()station to two or more other stations when available.
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited()the terms of the contract or the statute.
It will be a relief over the death of a friend or a relative if the friend or relative dies from ______.
()uses one or two high pressure pumps for all the cylinders with one more standby, while()have a separate high-pressure pump for each cylinder.
Organizations perform. work to achieve a set of objectives. Generally, work can be categorized as either projects or operations, although the two sometimes are(67).
Organizations perform work to achieve a set of objectives. Generally, work can be categorized as either projects or operations, although the two sometimes are ( ) .
If necessary to avoid collision or allow more time to()the situation,a vessel shall slacken her speed or take all way off by stopping or reversing her means of propulsion.
Regarding L2TP, in which two situations is a service module or service IOA required?() (Choose two.)
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
What are two ways to verify if a WX device is configured as a hub, a spoke, or a mesh device? ()(Choose two.)
]If a charter-party,although for two consecutive voyages,is held to be one indivisible contract,a deviation on the first voyage entitles the Charterer to treat the breach as a repudiation of()contract.
相关题目

No more having to buy expensive textbooks which you will only use for a year or two and then sell or _______ away. 

( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().

Organizations perform work to achieve a set of objectives. Generally, work can be categorized as either projects or operations, although the two sometimes are()

If a boy or a girl has grown up in a home with sharing tasks and decisions,he or she will probably______.
Although Australia has a large area,()of the continent is desert or semi-desert.
In the emergency alarm signals, if the alarm or whistle two long sounds followed by one short sound for 1 minute, it is the () emergency.
In each cylinder cover there are two or three holes for ()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
A ship is responsible for the cargo loaded or unloaded().
()in a charter-party are working days on which the weather allows loading work or discharging work to be done.
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
The knot used to join two lines or two large hawsers for towing is called a().
下列程序段的执行结果为( )。 Dim A(3,3) For M=1 To 3 For N=1 To 3 If N=M Or N=3-M+1 Then A(M,N)=1 Else A(M,N)=0 End If Next N Next M For M=1 To 3 For N=1 To 3 Print A(M,N) Next N Print Next M
下列程序段的执行结果为 Dim A(3,3) For M=1 To 3 For N=1 To 3 If N=M Or N=3-M+1 Then A(M,N)=1 Else A(M,N)=0 End If Next N Next M For M=1 To 3 For N=1 To 3 Print A(M,N) Next N Print Next M
下列程序段的执行结果为( )。 Dim A(3,3) For M=1 To 3 For N=1 To 3 If N=M Or N=3-M+1 Then A(M, N)=1 Else A(M,N)=0 End If Next N Next M For M=1 To 3 For N=1 To 3 Print A(M,N) Next N Print Next M
()in a charter-party are working days on which the weather allows loading work or discharging work to be done.
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
Project ______is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
广告位招租WX:84302438

免费的网站请分享给朋友吧