首页/ 题库 / [单选题]It()be better to arr的答案

It()be better to arrive at the railway station earlier.

单选题
2021-07-19 08:21
查看答案

正确答案
C

试题解析

标签: 专升本英语
感兴趣题目
It was not until he arrived at the railway station _____ he realized he had forgotten his ticket.
A block that can be opened at the hook or shackle end to receive a bight of the line is a().
It’s()to stow optional cargo in the lower hold.You’d better give it block stowage in the tweendecks,then it can be easily discharged either at Shanghai,or Dalian or Tianjin.
It must never be forgotten()the master has no authority to take extraordinary measures for the cargo owner if the latter or his representative can be communicated with.
()anything provided for in Clause 7 and 8 of this bill of lading and subject to Clause 17,if it can be proved where the loss or damage occurred the carrier and the merchant shall,as to the liability of the carrier,be entitled to require such liability to be determined by the provisions contained in any relevant international convention or national law.
The nexttrain to Beijing is ________ to arrive at 9 a.m.
When the vessel arrives, the cargo of machinery to be unloaded is().
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
What form should the master hand over to the Customs Officer at the port of arrival().
Course directed by the OSC or CSS to be steered at the beginning of a search is().
Course directed by the OSC or CSS to be steered at the beginning of a search is().
Course directed by the 0SC or CSS to be steered at the beginning of a search is().
相关题目

— Is it better to be physically attractive or intelligent?

   —                      

Hardly had they arrived at the airport ___the plane started to leave.
Any loss or damage noticed when the goods are delivered must be reported to the ___at the time, otherwise he will not be liable for it.
It()be better to arrive at the railway station earlier.
It is __ from my school to the railway station.
It would be better to make a decision now,()eave it until next week. 选项

()involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application area.

The next train to Beijing is()to arrive at a.m.
In the absence of a custom or special contract to the contrary,the Shipowner is not bound to ()the consignees that he is ready to unload on arriving at the port of discharge.
()at the railway station when it began to rain.
You’d better()the optional cargo block stowage in the tweendecks, then it can be easily discharged either at Shanghai or Dalian.
() may be the first possible cause which makes the engine to lose power or slow down when it is running.
Assuming you build networks to exact specifications, what is the recommended maximum length a 10BaseT cable can be before it has to be segmented or repeated?()
Assuming you build networks to exact specifications, what is the recommended maximum length a 10BaseT cable can be before it has to be segmented or repeated?
After arrived at the port, if it is necessary to lift the piston out and inspect the M-E temporarily, the chief engineer should report the situation to the(), and the operation could be performed only after having the approvement of relevant department.
In reference to air conditioning, when air attains the maximum amount of moisture it can hold at a specific temperature, it is said to be ().
Whether a ship is sailing before the wind or sailing in the rough sea, we must reduce the fuel injection of the main engine.For the former one, it aims to prevent the main engine being(), while for the later one, it aims to prevent the main engine being().
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
A notice of readiness is not valid unless it indicates that the vessel is ready to load or discharge as the case may be,at the time()it is given.
广告位招租WX:84302438

免费的网站请分享给朋友吧