首页/ 题库 / [单选题]Is it far from here?的答案

Is it far from here?

单选题
2021-09-01 15:57
A、It’s clear.
B、Go along the road.
C、Don’t bother. I’ll call back later
D、It takes twenty minutes to walk there.
查看答案

正确答案
D

试题解析

相关题目
The village is far away from here indeed. It's _____ walk.
Many students here are second- or third-generation ______ from China.
The village is far away from here indeed. It\'s _____ walk.
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
Is it far from here?
22. Many students here are second- or third-generation ______ from China.
Is the shopping mall far from here?
How far is it from here to the library?
__________ is the act performed by or resulting from saying something; it is the consequence of, or the change brought about by the utterance.
There shall be()into sleeping rooms from cargo and machinery spaces or from galleys,storerooms,drying rooms or communal sanitary areas.
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
()act is the act performed by or resulting from saying something.
Damage to cargo caused by fumes or vapor from liquids,gases, or solids is known as().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Water in the fuel can prevent the engine from starting, prevent it from developing full power, or ()
Air or noncondensable gas is removed from a refrigeration system by a ()
The important thing is that this is a major breakthrough. “breakthrough” here means an important development or achievement.
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
Project ______is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)
广告位招租WX:84302438

免费的网站请分享给朋友吧