首页/ 题库 / [单选题]无支架施工包括缆索吊装、( )拼装、转体的答案

无支架施工包括缆索吊装、( )拼装、转体施工等。

单选题
2021-09-01 19:54
A、悬臂拼装
B、就地浇注
C、移动模架
D、现浇
查看答案

正确答案
A

试题解析

感兴趣题目
钢梁施工主要分为支架拼装钢梁、纵移法架设钢梁、浮运法架设钢梁和()
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
连续梁浇筑的方法包括有悬臂灌注法、顶推法、支架现浇法、转体施工法,目前公司施工经验较少,首次接触的施工方法是()
背景 某城市环路立交桥总长2.8km,其中跨越主干道部位设计采用钢一混组合梁,跨径52m,分为3个吊装段进行现场拼装。吊装前搭设2个门洞支架,鉴于吊装中间段的单节钢梁自重约98t。施工项目部为此制定了专项施工方案,拟采取以下措施: (1)为保证吊车安装作业,占用一条慢行车道,选择在夜间时段自行封闭道路后进行钢梁的吊装作业。 (2)请具有相应资质的研究部门对钢梁结构在拼装过程中不同受力状态下的强度、刚度和稳定性进行分析计算。 (3)通过招标程序将2个门洞支架的搭设及钢梁拼装分包给专业公司,签订分包合同,明确安装的技术质量要求。 问题 1、木工程工方案应包括哪些内容?简述专项施工方案与施工组织设计的关系。 2、项目部拟采取的措施一不符合哪些规定? 3、项目部拟采取的措施二的验算内容和项目是否齐全?如不齐,写出正确做法。 4、从项目安全控制总包和分包责任分工角度看,项目部拟采取的措施三是否全面?如不全,还应做哪些补充?
桥梁转体法施工与传统施工方法相比,具有哪些优点?
“悬臂施工、梁段预制、长线法施工工序”案例分析与答案解析题 背景材料: 某大桥为(50+4×80+50)m连续梁桥,主梁为双箱单室箱形结构,混凝土标号为50号,采用悬臂拼装施工工艺。梁段采用长线法预制,缆索吊装就位。 问题: 简要叙述长线法施工工序。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

指令ORS功能,可实现多个指令块的“与”运算。
无支架施工包括缆索吊装、( )拼装、转体施工等。
缆索吊装施工适用的场合是()
Logistic回归系数与优势比OR的关系为()。
缆索吊装施工适用的场合是()
市政道路工程施工资料中下列施工技术、管理资料仅需施工单位归档保存,而不需城建档案馆归档保存的是()。
缆索吊装施工法中,缆索吊装设备按用途和作用可以分为()等基本部分组成。
微表处工艺是城镇道路大修养护的施工方法之一,以下关于施工基本要求错误的是()。
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
缆索吊装法施工中,吊装用缆索必须根据()进行专门设计,搭架、缆索受力计算应符合施工规范规定。
管理(或非浮动)价格Administered(or inflexible) prices
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
广告位招租WX:84302438

免费的网站请分享给朋友吧