首页/ 题库 / [单选题]某企业拟建年生产能力为50万m3的构件厂的答案

某企业拟建年生产能力为50万m3的构件厂。已知已建同类型构件厂的年生产能力为30万m3,若生产能力指数为0.8,价格调整系数为1.2,用生产能力指数法估算,该拟建构件厂的投资额为已建同类型构件厂投资额的( )倍

单选题
2021-09-01 20:51
A、1.07
B、1.21
C、1.74
D、1.81
查看答案

正确答案
D

试题解析

感兴趣题目
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
()are liable to be stoten, pilfered or may damaged due to improper handing or stowage.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
某独立土方工程,招标文件中估计工程量为80万m3。合同中规定,土方工程单价为10元/m3,当实际完成工程量超过估计工程量10%时,调整单价,单价调为8元/m3。工程结束时实际完成土方工程量为100万m3,则该土方工程款为()万元。
某独立土方工程,招标文件中估计工程量为100万m3,合同中规定:土方工程单价为5元/ m3,当实际工程量超过估计工程量15%时,调整单价,单价调为4元/ m3。工程结束时实际完成土方工程量为130万m3,则土方工程款为(  )万元。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

某独立土方工程,招标文件中估计工程量为200万m3,合同中规定:土方工程单价为8元/m3,当实际工程量超过估计工程量15%时,调整单价,单价调为6元/m3。工程结束时实际完成土方工程量为250万m3,则土方工程款为(  )万元。

某土方工程,招标文件中估计工程量为100万m3,合同中规定:土方工程单价为5元/m3,当实际工程量超过估计工程量15%时,单价调整为4元/m3。工程结束时实际完成土方工程量为130万m3,则该土方工程款为()。
某企业拟建年生产能力为50万m3的构件厂。已知已建同类型构件厂的年生产能力为30万m3,若生产能力指数为0.8,价格调整系数为1.2,用生产能力指数法估算,该拟建构件厂的投资额为已建同类型构件厂投资额的( )倍
(单选、2.5分) 某独立土方工程,招标文件中估计工程量为27万 m3。合同中规定,土方工程单价为12.5元/m3;当实际工程量超过估计工程量15%时,调整单价为9.8元/ m3,工程结束时实际完成土方工程量35万 m3,则土方工程款为________万元。
某企业拟建年生产能力为50万m3的构件厂。已知已建同类型构件厂的年生产能力为30万m3,若生产能力指数为0.8,价格调整系数为1.2,用生产能力指数法估算,该拟建构件厂的投资额为已建同类型构件厂投资额的()倍。
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
已知A=40;B=30;C=100;D=50,逻辑“与”运算符为and,“或”运算符为or,“非”运算符为not。计算表达式(A>B+20)or(B+60<>
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
某拟建设备工程年生产能力为600万吨,与其同类型的某已建项目年生产能力为250万吨,设备投资额为5500万元。经测算,设备投资的综合调价系数为1.05。已知生产能力指数n=0.5,则拟建项目设备投资额()。
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
某土方工程,8月份计划工程量1.5万立方米,计划单价为10元/m3,实际完成工程量1.2万立方米,实际单价为8元/m3,8月底该土方工程的进度偏差为()万元。
广告位招租WX:84302438

免费的网站请分享给朋友吧