首页/ 题库 / [单选题]For a 4-band resisto的答案

For a 4-band resistor with “color code ”, the first band is the ()values.

单选题
2021-09-01 21:07
A、hundreds
B、tens
C、ten
D、all of above
查看答案

正确答案
B

试题解析

感兴趣题目
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
What is a functional or carriage requirement for compulsory vessels?()
What is a GMDSS functional or carriage requirement for compulsory vessels?()
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Banks have no liability for any delay or loss caused by postal or telex failure.
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
A mark or place at which a vessel comes under obligatory entry,transit,or escort procedure is know as().
相关题目
boost的意思是:help or encourage to increase or improve

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
_________ in a person’s speech or writing usually ranges on a continuum from casual or colloquial to formal or polite according to the type of communicative situation.
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
已知A=40;B=30;C=100;D=50,逻辑“与”运算符为and,“或”运算符为or,“非”运算符为not。计算表达式(A>B+20)or(B+60<>
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
A seaman may have all or part of his wages deposited by allotment to a bank or savings institution. Which of the following is NOT a requirement for this type of allotment? ()
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
A ship is responsible for the cargo loaded or unloaded().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
设a=2,b=3,c=4,d=5,下列表达式的值是( )。 3>2*b Or a=c And bc Or ba+c
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
Generally speaking, suction heads require to be () for high speed or large capacities than for low speed or small capacities.
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
广告位招租WX:84302438

免费的网站请分享给朋友吧