首页
题目
TAGS
首页
/
题库
/
[单选题](单选、2.5分) I’m afrai的答案
搜答案
(单选、2.5分) I’m afraid the box is ____ heavy for the boy.
单选题
2021-09-02 12:21
A、too very
B、very too
C、too much
D、much too
查看答案
正确答案
D
试题解析
标签:
棉花糖
河北工程技术学院大学英语1
感兴趣题目
(单选、2.5分) 钢筋工程施工中要看懂( )。
(单选、2.5分) 地上水塔工程宜选用( )
(单选、25分) We’ve missed the last bus I’m afraid we have no ________ but to take a taxi
1_____education is the instruction that occurs when the instructor and students are separated by distance or time,or both
已知某1/2砖墙,长4m、高2.5m,墙中有一门0.85×2m、一窗1.2×1.8m、两个空洞分别为0.4×0.8m及0.6×0.4m,请问其1/2砖墙工程量为()m³。
Either he or I ______to the airport.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
—Do the dishes,Mike,or I will tell mum!
I’m afraid I’ll spend _____ two hours on the problem.( )
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
相关题目
14 wondering whether perhaps you could remember the name of the place.-I\'m afraid that mefor the moment.
I’m afraid the box is ____ heavy for the boy.
I’m afraid he _______find the key to this problem.
[单选题,1.3分] I’m afraid we can’t have coffee; there’s _____ left.
I’m afraid I can’t finish the work _____ to help me. ( )
-I was wondering whether perhaps you could remember the name of the place. -I.m afraid that _______ me for the moment.
(单选、2.5分) I remembered that the air conditioners ________ turned off before I left home.
(单选、2.5分) The dish __________terrible! I don.t like it at all.
(单选、2.5分) I must tell you a letter from you.
(单选、2.5分) I’m afraid the box is ____ heavy for the boy.
(单选、2.5分) 工程量清单采用什么单价计价?( )
(单选、2.5分) 造价工程师执业资格实行什么制度?( )
(单选、2.5分) 一个生产车间的基础工程为( )。
(单选、2.5分) 组织建设工程顺序施工时,其特点包括( )。
(单选、2.5分) 工程项目最有效的科学组织方法是( )。
(单选、2.5分) 已知某工程网络计划中工作M的自由时差为3天,总时差为5天,现实际进度影响总工期1天,在其他工作均正常的前提下,工作M的实际进度比计划进度拖延了( )天。
(单选、2.5分) 工程网络计划的计划工期( )。
(单选、2.5分) 技术资料准备的内容不包括( )。
(单选、2.5分) 工程项目竣工验收应由( )组织。