首页/ 题库 / [多选题]We object to the ide的答案

We object to the idea that it is military force that should be _ in settling international disputes

多选题
2021-09-03 15:43
A、applied to
B、resorted to
C、fallen back on
D、restrained from
查看答案

正确答案
B@#@D

试题解析

感兴趣题目
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
The goal, which they are unlikely to live to see , is tocure, prevent or manage all diseasesin the next 80or so years.
Hey, Nick. ______ comes the last bus! Hurry up, or we’ll have to walk home.
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
Schedule compression shortens the project schedule without changing the project scope, to meet schedule constraints, imposed dates, or other schedule objectives. Schedule compression techniques include crashing and ( )
Schedule compression shortens the project schedule without changing the project scope, to meet schedule constraints, imposed dates, or other schedule objectives. Schedule compression techniques include crashing and ( )
() system is arranged to ensure that water can be drawn from any tank or the sea and discharged to any other tank or the sea as required to trim the vessel.
The objectives of the ISM Code are to ensure ①safety at sea②prevention of human injury or loss of life③avoidance of damage to the marine environment and to property
The objectives of()are to ensure safety at sea, prevention of human injury or loss of life, and avoidance of damage to the environment,in particular to the marine environment and to property.
Never()the lifeboat or lifecraft disengaging locks or hydrostatic release gears because it can cause them to fail to function.
Never()the lifeboat or lifecraft disengaging hocks or hydrostatic release gears because it can cause them to fail to function.
相关题目
before the problem grows into a big one, we have to take_____. Or we will suffer a great loss.( )
We object to the idea that it is military force that should be _ in settling international disputes
As Emerson puts it,____ we travel the world over to find the beautiful,we must carry it with us or we find it not
We need friends to ________, or we will feel lonely(单选)—4分

()involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application area.

Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
某学院张老师在某大学进修时,获取了该大学李教授编制的考试试卷,之后将该套试卷收入其编写的《典型试卷分析》,并将该《典型试卷分析》出版,则张老师(15)。
某学院张老师在某大学进修时,荻取了该大学李教授编制的考试试卷,之后将该套试卷收入其编写的《典型试卷分析》,并将该《典型试卷分析》出版,则张老师(28)。
It’s also essential that we can not()any marks mixed or damage to the cargo.
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
The objective of information ( ) includes protection of information and property from theft,corruption,or natural disaster,while allowing the information and property to remain accessible and productive to its intended users.
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
Teaching materials should agree with or reflect the teaching(),aims, objectives and teaching methods.
When we use the word()we mean that an idea or theory is being applied: that whatever the teacher does, certain theoretical principles are always borne in mind.
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
广告位招租WX:84302438

免费的网站请分享给朋友吧