首页/ 题库 / [单选题]The highest loads ap的答案

The highest loads applied to the diesel engine crankshaft main bearings are ()

单选题
2022-01-03 21:48
A、axial loads
B、firing loads
C、inertia loads
D、centripetal load
查看答案

正确答案
B

试题解析

感兴趣题目
()is the Shipowner’s duty to send the ship to the agreed,or in the absence of special agreement,to the usual place of loading.
Please tell the stevedores to load the cargo()according to the respective figures.
The“person in the phrase ”to designate a person or persons ashore having direct access to the highest level of management” refers to ().
If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses().
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
The strictest load line regulations apply to().
The()provides the project manager with the authority to apply organizational resources to project activities.
The()provides the project manager with the authority to apply organizational resources to project activities.
A system administrator has just applied an update to an AIX system to correct a problem, The APAR number is IX49035 and was shipped as part of the PTF number U437542. After applying the APAR fix, the administrator wants to ensure that the fix is applied before informing the system users of the corrected problem. Which of the following commands should the system administrator run to verify that the APAR fix has been applied to the system?()
The pollution prevention regulations do not apply to the transfer or discharge of ()
In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.
The(15)provides the project manager with the authority to apply organizational resources to project activities.
相关题目
The(  )provides the project manager with the authority to apply organizational resources to project activities。

为了保证船舶航行安全,首先要确定船舶的航向与位置。船舶定位方法按照参照目标可分为( )。

The()provides the project manager with the authority to apply organizational resources to project activities.

The defences and limits of liability()in this bill of lading shall apply in any action against the carrier for loss of or damage to the goods whether the action be founded in contract or in tort.
The Charterer is entitled to the benefit of the excepted perils during the transit of the goods from storing place to the actual place of loading,provided such transit substantially ()part of the operation of loading.
()may be laid ready for the cargo or may just be put in bundles ready for the stevedores to lay out as the cargo is loaded.
The ( ) provides the project manager with the authority to apply organizational resources to project activities。

The()provides the project manager with the authority to apply organizational resources to project activities.

During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
In the combustion chamber, the part whose surface is exposed to the highest temperature is the ().
The highest loads applied to the diesel engine crankshaft main bearings are ()
Lay days()to commence after the expiry of a specified time after the giving of the notice of readiness to load or discharge.
The ship will be responsible for the cargo loaded or unloaded().
The ship will be responsible for the cargo loaded or unloaded().
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
If the Charterer loads or discharges the vessel in a shorter time than is allowed to him by the lay days,he may be entitled to().
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
Notice of readingness to load must be served()the charterer or his agent.
Notice of Readiness to Load must be served()the Charterer or his agent.
If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.
广告位招租WX:84302438

免费的网站请分享给朋友吧