首页/ 题库 / [单选题]The number or name o的答案

The number or name of a tank barge shall be().

单选题
2022-01-01 13:49
A、displayed in at least 4 different positions on the barge
B、carved on a wooden board and attached to the barge's hull
C、displayed as close to the navigation lights as possible
D、displayed at the highest point of the barge's hull such that it can be seen from either side
查看答案

正确答案
D

试题解析

感兴趣题目
Where tanks are arranged for either oil or ballast () must be fitted in the pipe so that only the ballast main or the oil transfer main connected to the tank.
The()provides a rapid means of tallying when items of the same commodity are being loaded or unloaded in uniform drafts consisting of an equal number of pieces.
What is NOT a responsibility of the tankerman in charge of loading an unmanned tank barge? ()
What is NOT a requirement of the reinspection for a tank barge with a certificate of inspection valid for two years? ()
The () or balance tank collects the re-circulated fuel oil.
The () or balance tank collects the re-circulated fuel oil.
It will be a relief over the death of a friend or a relative if the friend or relative dies from ______.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved. 空白(1)处应选择()
() system is arranged to ensure that water can be drawn from any tank or the sea and discharged to any other tank or the sea as required to trim the vessel.
The international number,location and/or name,geographical co-ordinates,characteristics and intensity,elevation in metres,range in sea miles and description of structure of a light can be found in().
相关题目
The master()in delivering the goods to the consignee named in the bill of lading on production thereof,or to the first person who presents a properly indorsed bill of lading.
The attitudes or emotion of a language user in choosing a word and the influence of these on the listener or reader’s interpretation of the word form ___ of a word.
If the cause of a sudden severe list or trim is negative initial stability,counter flooding into empty tanks may().
According to Hedge, a connotative meaning of a word refers to ‘the ___ or emotions of a language user in choosing a word and the influence of these on the listener’s or reader’s ___ of the word’
根据所运货物的危险程度,《IBC规则》将散装化学品船分成()种类型,其中()型适合于装载危险性最大的散装化学品。
根据所运货物的危险程度,《IBC规则》将散装化学品船分成()种类型,其中()适合于装载危险性最小的散装化学品。
《IBC规则》中的散装液体化学品主要指在37.8℃时绝对蒸气压力不超过()kg/cm2的液体散装货物。
The number or name of a tank barge shall be().
The number of flashlights required as lifeboat equipment on a seagoing barge is().
A project life cycle is a collection of generally sequential project ( ) whose name and number are determined by the control needs of the organization or
If the Certificate of Inspection of a damaged tank barge has expired,which certificate may be issued to allow its movement to a repair facility? ()
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.

A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved.

空白(1)处应选择()

A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved.


空白(2)处应选择()
A project life cycle is a collection of generally sequential project (73) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74) for managing the project, regardless of the specific work involved.
Increasing the number of slack liquid tanks has effect of raising the().
Increasing the number of slack liquid tanks has the effect of raising the().
广告位招租WX:84302438

免费的网站请分享给朋友吧