A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved. 空白(1)处应选择()

单选题
2022-06-28 18:46
A、phases
B、processes
C、segments
D、pieces
查看答案

正确答案
A

试题解析

标签: CMS专题
感兴趣题目
The purpose of the skirt or trunk in four-stroke cycle engines is to act in a similar manner to a ().
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)
Team selection is not just a function of finding someone whos a technical or administrative expert. What will a project sponsor leading a high visibility project look for in a project manager?()
The schedule management plan is a component of the project management plan. The Schedule management plan maybe formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycleIt is().
A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved. 空白(1)处应选择()
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
Gas exchange, which is a basic part of the cycle of an internal combustion engine, is()
In C language,(58) is a collection of one or more variables,possibly of different types, grouped together under a single name for convenient handling.
In C language,(70)is a collection of one or more variables, possibly of different types, grouped together under a single name for convenient handling.
A disadvantage of a four-stroke/cycle diesel engine is ()
相关题目

A collection of related data that is the electronic equivalent of a file cabinet.

( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
Thomas Browne’s Religia Medici is a collection of opinions on a vast number of subjects more or less connected with religion()
A () is a collection of projects and other work that are grouped together to facilitate effect -ive management of thatwork to meet strategic business objectives.
A ( )is a collection of projects and other work that are grouped together to facilitate effect -ive management of that work to meet strategic business objectives.
A()is a set of procedures or a collection of techniques used in a systematic way which it is hoped will result in efficient learning.
A project life cycle is a collection of generally sequential project ( ) whose name and number are determined by the control needs of the organization or
A schedule is commonly used in project planning and project portfolio management. () on a schedule may be closely related to the work breakdown structure (WBS)terminal elements, the statement of work, or a contract data requirements list.
● The completion and approval of one or more () characterizes a project phase.()A.deliverables B.products C.projects D.programs
●A _(72) is a collection of projects and other work that are grouped together to facilitate effective management of that work to meet strategic business objectives.
● A work breakdown structure (WBS) is a tool used to define and group a project's discrete work elements in a way that helps organize and define the total work scope of the project. A WBS is most useful for(72) .(72)
●A (74) is a named collection of information.
In project management and systems engineering,()is a deliverable-oriented breakdown of a project into smaller components. It is a key project deliverable that organizes the team's work into manageable sections.

A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved.

空白(1)处应选择()

A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved.


空白(2)处应选择()
A project life cycle is a collection of generally sequential project (73) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74) for managing the project, regardless of the specific work involved.
The Project Management Triangle is a model of the constraints of project management. These constraints have been listed scope (or quality), ( ), and cost
A predictable result of a vessel nearing a bank or edge of a channel is that the().
A Database Management System(DBMS) consists of a collection of interrelated data and a collection of () to access to that data
A ( ) is a collection of projects and other work that are grouped together to facilitate effect -ive management of thatwork to meet strategic business objectives.
广告位招租WX:84302438

免费的网站请分享给朋友吧