首页/ 题库 / [单选题]A project life cycle的答案

A project life cycle is a collection of generally sequential project (73) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74) for managing the project, regardless of the specific work involved.

单选题
2022-01-04 17:40
A、phases
B、processes
C、segments
D、pieces
查看答案

正确答案
A

试题解析

标签:
感兴趣题目
A ( ) is a collection of projects and other work that are grouped together to facilitate effect -ive management of thatwork to meet strategic business objectives.
General linguistics is generally the study of language as a whole.
One of the requirements for a general average act is().
Team selection is not just a function of finding someone whos a technical or administrative expert. What will a project sponsor leading a high visibility project look for in a project manager?()
The main purpose of the essay is to describe the life cycle of the lobster
The following statements have been made about life cycle costing:(i) It focuses on the short-term by identifying costs at the beginning of a product’s life cycle(ii) It identifies all costs which arise in relation to the product each year and then calculates the product’s profitability on an annual basis(iii) It accumulates a product’s costs over its whole life time and works out the overall profitability of a product(iv) It allocates costs to each stage of a product’s life cycle and writes them off at the end of each stageWhich of the above statements is/are correct?
The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycleIt is().
A milestone is a significant () in a project.
A milestone is a significant () in a project.
A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved. 空白(1)处应选择()
Gas exchange, which is a basic part of the cycle of an internal combustion engine, is()
A disadvantage of a four-stroke/cycle diesel engine is ()
相关题目

Computer software, or just software is a general term used to describe a collection of computer programs, procedures and documentation that perform some tasks on a computer system. The term includes: .

A collection of related data that is the electronic equivalent of a file cabinet.

A () is a collection of projects and other work that are grouped together to facilitate effect -ive management of thatwork to meet strategic business objectives.
A ( )is a collection of projects and other work that are grouped together to facilitate effect -ive management of that work to meet strategic business objectives.
A()is a set of procedures or a collection of techniques used in a systematic way which it is hoped will result in efficient learning.
A project life cycle is a collection of generally sequential project ( ) whose name and number are determined by the control needs of the organization or
”Cost of quality ” is a project management concept that includes cost of ( ).
“Cost of quality”is a project management concept that includes cost of( 73)
A critical path for a project is the series of activities that determine( ) by which the project can be complete
●A _(72) is a collection of projects and other work that are grouped together to facilitate effective management of that work to meet strategic business objectives.
● A work breakdown structure (WBS) is a tool used to define and group a project's discrete work elements in a way that helps organize and define the total work scope of the project. A WBS is most useful for(72) .(72)
●A (74) is a named collection of information.
In project management and systems engineering,()is a deliverable-oriented breakdown of a project into smaller components. It is a key project deliverable that organizes the team's work into manageable sections.

A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved.

空白(1)处应选择()

A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved.


空白(2)处应选择()
A project life cycle is a collection of generally sequential project (73) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74) for managing the project, regardless of the specific work involved.
Exhaust gases are generally removed from the cylinders of a two-stroke/cycle diesel engine by()
The general purpose of a heat exchanger is to ().
The project life-cycle can be described as (72).
A Database Management System(DBMS) consists of a collection of interrelated data and a collection of () to access to that data
广告位招租WX:84302438

免费的网站请分享给朋友吧