首页/ 题库 / [单选题]One of the requireme的答案

One of the requirements for a general average act is().

单选题
2022-03-12 14:56
A、a successful venture
B、no imminent peril
C、no losses
D、All of the above
查看答案

正确答案
A

试题解析

感兴趣题目
One of the greatest features of a home ______ is the ability to share one Internet connection simultaneously over two or more computers.
()an order for one thousand tons or more we grant a special discount of 10%.
One of the greatest features of a home(74)is the ability to share one Internet connection simultaneously over two or more computers.
RULE III. EXTINGUISHING FIRE ON SHIPBOARD: Damage done to a ship and cargo, or either of them, by water or otherwise, including damage by beaching or scuttling a burning ship, in extinguishing a fire on board the ship, shall be made good as general average; except that no compensation shall be made for damage by smoke or heat however caused. 根据以上条款,不能列入共同海损的是()。
The Master or person in charge of a ship is required to log().
Generally speaking, suction heads require to be () for high speed or large capacities than for low speed or small capacities.
How is the Master or operator of a vessel required to keep the crew informed of the regulations concerning the discharging of garbage overboard?().
One of the requirements for a general average act is().
What is NOT a requirement of the reinspection for a tank barge with a certificate of inspection valid for two years? ()
The deviation ordered by the Admiralty for strategic reasons in wartime()to a general average act,because the masters obeying the order had no opportunity of exercising their own judgment or discretion.
Chemical Tankers are generally referred to the cargo ships constructed or adapted and used for the carriage of().
A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved. 空白(1)处应选择()
相关题目
34. One of the requirements for a fire is that the material ____ to its burning temperature.
34. One of the requirements for a fire is that the material ____ to its burning temperature.
Generally speaking, the __________ specifies whether a certain tagmeme is NOT in the position of the Nucleus or of the Margin in the structure
Which one of the following is not generally recognized as one constitute of bilge water?()
Under the terms of ISPS Code, shipping companies are required to designate a Company Security Officer for the Company and a()for each of its ships.
Apart from special contract or statute every Shipowner is()a liability akin to that of a common carrier,irrespective of whether the goods were shipped by a Charterer or on a general ship.
A project life cycle is a collection of generally sequential project ( ) whose name and number are determined by the control needs of the organization or
For a sacrifice or expenditure to be the subject of general average contribution,there must be a danger common to().
A switchboard for an AC electrical system requires the use of which of the following devices().
One end of a cylinder for a medium or high-speed diesel engine is sealed by the piston and rings, the other end is sealed by the ()
The following information is available for a manufacturing company which produces multiple products:(i) The product mix ratio(ii) Contribution to sales ratio for each product(iii) General fixed costs(iv) Method of apportioning general fixed costsWhich of the above are required in order to calculate the break-even sales revenue for the company?
During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised ( )are necessary.
During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised(75)are necessary.
A seaman may have all or part of his wages deposited by allotment to a bank or savings institution. Which of the following is NOT a requirement for this type of allotment? ()
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of user and focus on user needs are called( ). Requirements written from the developer&39;s perspective and describe how the system will be implemented are called( ). Requirements evolve from detailed statemens of business capabilities that a system should have to detailed statements of the technical way in which the capabilities will be implemented in the new system. Requirements can be either functional or nofunctional in nature. For example, during the analysis phase of travel vehicles sales system, the system that must have the ability to search for available inventory is( ). The requirement that the system should be able to work on any Web browser belongs to( ). That customer personal information is protected in compliance with the Data Protection Act is a requirement of( ).
Whether a ship is sailing before the wind or sailing in the rough sea, we must reduce the fuel injection of the main engine.For the former one, it aims to prevent the main engine being(), while for the later one, it aims to prevent the main engine being().

A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved.

空白(1)处应选择()

A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved.


空白(2)处应选择()
A project life cycle is a collection of generally sequential project (73) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74) for managing the project, regardless of the specific work involved.
广告位招租WX:84302438

免费的网站请分享给朋友吧