The requirements of the ISM Code may be applied to ().

单选题
2022-01-02 23:22
A、only oil tankers
B、only passenger ships
C、only containers
D、all shi
查看答案

正确答案
D

试题解析

感兴趣题目
The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understandin is reached on the meaning of the requirements. The result of this analysis and dialog is an ( )set of requirements.
The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result of this analysis and dialog is an(74)set of requirements.
Although goods have been lost or damaged whilst in the custody of the Shipowner,()not necessarily responsible,for his liability in respect of them may have been excluded by the rules of common law or by the express terms of the contract or by statute.
A(An)()should be issued for every company complying with the requirement of the ISM Code by the Administration.
How is the Master or operator of a vessel required to keep the crew informed of the regulations concerning the discharging of garbage overboard?().
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited()the terms of the contract or the statute.
The rules state that vessels may depart from the requirements of the Rules when().
The master may bind the Shipowner or Charterer()doing such things as are necessary on the part of the one or of the other to carry out the contract.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
The objectives of the ISM Code are to ensure ①safety at sea②prevention of human injury or loss of life③avoidance of damage to the marine environment and to property
The prima facie rule that the law of the flag governs contracts of carriage by sea()the paramount rule of the intention of the parties,which may be express,or implied from the circumstances of the sea.
相关题目
ISM规则目的是为()提供一个国际标准。Ⅰ船舶营运安全;Ⅱ船舶防止污染管理;Ⅲ船舶营运成本管理;Ⅳ船员管理
根据ISM规则规定,到2002.7.1时下列哪些船舶必须建立安全管理体系()。
The ISM code is part of().
In the ISM code, “company” doesnt mean()
The term “the Company” in the ISM Code is defined as ().
In the International Code of Signals,the code signal meaning I require immediate assistance is().
The objectives of the ISM Code are to ensure ().
The requirements of the ISM Code may be applied to ().
The safety management objectives of the ISM Code are ().
The requirements of the ISM Code may be applied to
Which of the following about ISM Code is not right?()
The company which is defined in the ISM Code means()
All the following are the objectives of ISM code except().
Inquiries()the condition of the patients may be made personally or by telephone.
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited by the terms of().

During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised()are necessary.

During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised ( )are necessary.
● During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised (75)are necessary.(75)
During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised(75)are necessary.
A seaman may have all or part of his wages deposited by allotment to a bank or savings institution. Which of the following is NOT a requirement for this type of allotment? ()
广告位招租WX:84302438

免费的网站请分享给朋友吧