首页/ 题库 / [单选题]The safe working loa的答案

The safe working load of the derrick is ().

单选题
2022-05-08 00:48
A、5 tons
B、5 metres
C、5 feet
D、5 years
查看答案

正确答案
A

试题解析

感兴趣题目
()is the Shipowner’s duty to send the ship to the agreed,or in the absence of special agreement,to the usual place of loading.
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire most likely to be mentioned?().
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire mostlikely to be mentioned?().
()in a charter-party are working days on which the weather allows loading work or discharging work to be done.
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
The safe working load of the derrick is ().
The safe working load of the derrick is ().
When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The records of ship security training, drills and exercises shall be kept in the working language or languages of the shipIf the language or languages used are not(), a translation into one of these languages shall be included.
Should it appear that war or blockade would prevent the vessel from safely reaching the port of destination and / or discharging the goods thereat,the Carrier().
相关题目
What ________ the safe working load of the derrick?
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
Her father gave her the()of going on to college or starting to work.
The drive motor will have a brake arranged to fail-safe, ieit will () the load if power fails or machine is stopped.
The drive motor will have a brake arranged to fail-safe, i√eit will () the load if power fails or machine is stopped.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
Lay days()to commence after the expiry of a specified time after the giving of the notice of readiness to load or discharge.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The ship will be responsible for the cargo loaded or unloaded().
The ship will be responsible for the cargo loaded or unloaded().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
()in a charter-party are working days on which the weather allows loading work or discharging work to be done.
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
联合收割机驾驶人考试科目分为科目一:理论知识考试;科目二:田间(模拟)作业驾驶技能考试;科目三:场地驾驶技能考试;科目四:方向盘自走式联合收割机道路驾驶技能考试。()
The()provides a rapid means of tallying when items of the same commodity are being loaded or unloaded in uniform drafts consisting of an equal number of pieces.
Notice of readingness to load must be served()the charterer or his agent.
Notice of Readiness to Load must be served()the Charterer or his agent.
The MINIMUM acceptable size for a towing bridle would be that size in which the safe working load (SWL) of each leg of the bridle is equal to().
考试员资格培训和考试的内容包括道路交通安全法律、法规和相关知识、廉政警示教育、计算机评判系统操作、驾驶技能和考试评判能力。
广告位招租WX:84302438

免费的网站请分享给朋友吧