首页/ 题库 / [单选题]The load rating of a的答案

The load rating of an AC generator is determined by the()

单选题
2021-07-23 06:41
A、internal heat it can withstand
B、load it can carry continuously
C、load it is capable of supplying
D、overload it can carry for a specified time only
查看答案

正确答案
A

试题解析

相关题目

为了保证船舶航行安全,首先要确定船舶的航向与位置。船舶定位方法按照参照目标可分为( )。

The load rating of an AC generator is determined by the()
The power factor of an AC generator operating singularly is determined by the ()
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
The most common type of AC service generator found aboard ship is the stationary ().
The frequency of an AC generator is controlled by the ()
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
The voltage developed by an AC generator is controlled by varying the ()
The flood stream here is at an average rate of 0.8().
If the redelivery of a vessel is delayed by causes (),hire is payable at the charter rate until redelivery even though the market rate may have gone up or down.
The delivery rate of an axial-piston hydraulic pump is controlled by varying the position of the ().
If the result of loading a vessel is an increase in the height of the center of gravity,there will always be an increase in the().
To increase the frequency of an operating AC generator, you should ()
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
The()provides a rapid means of tallying when items of the same commodity are being loaded or unloaded in uniform drafts consisting of an equal number of pieces.
In the modulation style. of PSK, if a kind of Modem's modulation rate is 3200baud and it's phase is 8, what is the data transfer rate of this kind of Modem ?
A notice of readiness is not valid unless it indicates that the vessel is ready to load or discharge as the case may be,at the time()it is given.
()is the Shipowner’s duty to send the ship to the agreed,or in the absence of special agreement,to the usual place of loading.
广告位招租WX:84302438

免费的网站请分享给朋友吧