首页/ 题库 / [单选题]The complete assembl的答案

The complete assembly of bedplate, A-frames and cylinder block is held together by () to form a rigid structure.

单选题
2021-08-20 12:35
A、tap-bolts
B、jack-bolts
C、tie rods
D、fitted rod
查看答案

正确答案
C

试题解析

感兴趣题目
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Although goods have been lost or damaged whilst in the custody of the Shipowner,()not necessarily responsible,for his liability in respect of them may have been excluded by the rules of common law or by the express terms of the contract or by statute.
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
When the renewal verification is completed more than three months before the expiry date of the existing Document of Compliance or Safety Management Certificate, the new Document of Compliance or the new Safety Management Certificate should be valid from the date of () for a period not exceeding five years.
() are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
(75)are individuals and organizations that are actively involved in the project,or whose interests may be affected as a result of project execution or project completion.
are individuals and organizations that are actively involved in the project,or whose interests may be affected as a result of project execution or project completion.
are individuals and organizations that are actively involved in the project, or whose interests may be affected as aresult of project execution or project completion, they may also exert influence over the project and its results.

() are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion.

相关题目

() are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion.

我国海船船员考试发证等规则的制定,是以()公约为主要依据的。
The attitudes or emotion of a language user in choosing a word and the influence of these on the listener or reader’s interpretation of the word form ___ of a word.
《中华人民共和国海船船员船上培训管理办法》中的船上培训是指申请三副、三管轮适任证书的船员通过理论考试后在船舶上进行的(),以及申请船长、轮机长、大副、大管轮适任证书的船员通过理论考试后在船舶上进行的()。
申请海船船员适任证书考试的船员的应具备的条件包括。()
根据我国《海船船员适任考试、评估和发证规则》的规定,申请适任证书者应符合下列哪些基本条件,并不限于:()I、持有有效的《船舶服务簿》;II、小于60周岁;III、申请海船高级船员适任证书者,年龄不小于20周岁;IV通过该规则规定的适任考试和评估,完成该规则规定的船上培训或见习。
根据我国《海船船员适任考试、评估和发证规则》的规定,在中国籍海船上任职的船长、甲板部高级船员和值班水手应当持有与其所服务的()和所担任的职务相符的有效适任证书。I、船舶航区;II、船舶种类;III、船舶等级;IV、主机类别。
根据我国《海船船员适任考试、评估和发证规则》的规定,申请适任证书者应符合下列哪些基本条件,并不限于:()I、持有有效的《船员服务簿》;II、男性船员小65周岁;III、符合海船船员体检标准;IV、通过本规则规定的适任考试和评估,完成本规则规定的船上培训或见习。

根据《中华人民共和国海船船员适任考试发证规则》的规定,在中国籍海船上任职的船长、甲板部高级船员金额值班水手应当持有与其所服务的()和所担任的植物相符的有效适任证书。
①船舶航区;
②船舶种类;
③主机功率;
④船舶吨位。

根据《中华人民共和国海船船员适任考试发证规则》的规定,船员职能根据()分为管理级;操作级;支持级。
《中华人民共和国海船船员适任考试和发证规则》规定,不属于无限航区一般散货船适航必备的船员证书是()。

PDM includes four types of dependencies or precedence relationships:().The completion ofthe successor activity depends upon the initiation of the predecessor activity.

在()上服务的船员不适用于我国现行《海船船员值班规则》。
Ⅰ.军用船舶;
Ⅱ.营业的游艇;
Ⅲ.渔船;
Ⅳ.构造简单的木质船舶。

Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
● The completion and approval of one or more () characterizes a project phase.()A.deliverables B.products C.projects D.programs
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
广告位招租WX:84302438

免费的网站请分享给朋友吧