首页/ 题库 / [单选题]Who is the event for的答案

Who is the event for

单选题
2021-09-02 16:15
A、Experts.
B、Adults.
C、Children.
查看答案

正确答案
C

试题解析

感兴趣题目
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)
The FEC mode is for()from()station to two or more other stations when available.
If the carrier is responsible for the damage or loss of the cargo,()will have to pay to the insurance company.
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
The purpose for the bag or box on top of some survival craft is to().
is the budgeted amount for the work actually completed on the schedule acticity or WBS comonent during a given period。
Brokers are those people, according to the passage, who buy or sell business shares for others.
Passage 8  ● Read the email and brochure below.  ● Complete the booking form on the opposite page.  ● Write a word or phrase (in CAPITAL LETTERS) or a number on lines 41-45 on your Answer Sheet.Hi Tracy,  Could you please fill in the form to book a 2-day team-building event with Wildevent Company for eight of our sales staff? The following is the brochure. I suggest the weekend of 24/25 November. We just need four double rooms and a small meeting room. Could you ask for a coach to collect us?Thanks.Alan  Event Check List:  Location  Day Event or Overnight with Accommodation.  Accommodation no. of delegates (Rooms-shared or single rooms, leisure facilities).  Dinner Requirements—private, themed or entertainment.  Conference room size and seating Special Needs-meeting room equipment, sound systems, grounds for events.  Transportation—parking, coaches for collection and return of delegates.  Delegate Type—24hr or day delegate.  Tel: 01787 269 819  Booking Form
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
The () is used for hauling in or letting out the wires or ropes.
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
相关题目
The point is not who said the words, _____ they are true or not.
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
What is going to be the topic for the event
Who is the event for
In what way is the market very real for each person or businessman who is making and selling something ( )
It is usually decided by the()terms whether the shipper or the consignee pays for the cargo insurance.

Consider the events_% tables in performance Schema.
Which two methods will clear or reset the collected events in the tables?()

Fire protection and manning regulations for towing vessels state that the Master or person in charge must ensure that all crew members who have not participated in the drills or received the safety orientation().
If the carrier is responsible for the damage or loss of the cargo,()will have to pay to the insurance company.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
The purpose for the bag or box on top of some survival craft is to().
A ship is responsible for the cargo loaded or unloaded().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
A feeler or thermal bulb is used for the expansion valve to ().
What is the default value for the ENABLED attribute of a job or program when it is created? ()
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
According to SOLAS, 1974, as amended, the shipowner or any person who has assumed responsibility for the ship (the “Company”) must()
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
广告位招租WX:84302438

免费的网站请分享给朋友吧