首页/ 题库 / [单选题]The boys stood at th的答案

The boys stood at the shore of the river which was filled with water from the melting snow in the mountains, and they were hesitating to________the icy water below them

单选题
2021-09-02 17:07
A、dive into
B、ride into
C、dive at
D、ride at
查看答案

正确答案
A

试题解析

感兴趣题目
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited()the terms of the contract or the statute.
The movement of water away from the shore or downstream is called a(n)().
Repairing damage to the hull at or above the waterline reduces the threat of().
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
Course directed by the OSC or CSS to be steered at the beginning of a search is().
Course directed by the OSC or CSS to be steered at the beginning of a search is().
Course directed by the 0SC or CSS to be steered at the beginning of a search is().
Sometimes lights are()by fog,haze,dust,smoke,or precipitation which may be present at the light,or between the light and the observer,and which is possibly unknown by the observer.
相关题目

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

Don.t mention that at the beginning of the story, or it may ____ the shocking ending
The boys stood at the shore of the river which was filled with water from the melting snow in the mountains, and they were hesitating to________the icy water below them
17I remembered the day when World War II finished I was eight or nine at the time , and we heard it ___ when we were at the table
兰州大学网络教育学院成立于
Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
Data items are added or deleted from the list only at the top of the______.
● Data items are added or deleted from the list only at the top of the (72) .(72)
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Either you or the headmaster()the prizes to those gifted students at the meeting
After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or().
Keeping the draft at or below the load line mark will insure that the vessel has adequate().
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
If there is a strike or lock-out affecting the cargo on or after vessel’s arrival at port of discharge and the same has not been settled within 48 hours,Receivers shall have the option of keeping vessel waiting until such strike or lock-out is at an end against paying half demurrage after expiration of the time prescribed for discharging or ordering the vessel to a substituting port.The “same” refers to().
Water evaporates or steam condenses at the saturation temperature, which depends upon the pressure, the higher the pressure () the saturation temperature.
TCP functions at the Open System Interconnection(OSI)(61)layer, or Layer 4. Its chief responsibility is to ensure(62)end-to-end connectivity. IP, located one layer down, at the OSI network layer, or Layer 3, communicates the addresses of each(63)sender and receiver to the routers along the way. Routers and Layer 3 switches can read IP and other Layer 3(64). This information, combined with routing tables and other network intelligence, is all it takes to get(65)the room or around the world via TCP/IP.
广告位招租WX:84302438

免费的网站请分享给朋友吧