首页/ 题库 / [单选题]Which is the winter 的答案

Which is the winter load waterline on the load waterline mark?().

单选题
2022-02-23 00:21
A、The line over the summer load waterline
B、The line above the tropical load waterline
C、The line below the tropical load waterline
D、The line between the summer and the winter north Atlantic load waterline
查看答案

正确答案
D

试题解析

感兴趣题目
The Shipowner is entitled to()freight if he is ready to deliver at the port of destination the goods which were loaded.
()in a charter-party are working days on which the weather allows loading work or discharging work to be done.
The load on the crosshead pin is always (), so it is the ()half of the bearing which is subject to wear.
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.
When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().
The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().
Which of the following factors will have the greatest effect on the heating load within a conditioned space?()
Repairing damage to the hull at or above the waterline reduces the threat of().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
Which IS-IS authentication method is supported on the ERX Edge Router?()
A technician is performing scheduled preventive maintenance on a laser printer. Which of the following should the technician clean or replace? ()
相关题目
Point out which sentence is used to show the personality of a person who is used to sleeping
on his or her stomach?
Point out which sentence is used to show the personality of a person who is used to sleeping
on his or her stomach?
The room, which window faces the south, is the nicest one of all on this floor.which is wrong?
Compliance with the terms of the load line certificate on a ship is the responsibility of the().
Compliance with the terms of the load line certificate on a vessel is the responsibility of the().
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
The quantity or condition which is measured and controlled is known as the ()
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
A ship is responsible for the cargo loaded or unloaded().
()in a charter-party are working days on which the weather allows loading work or discharging work to be done.
On a semisubmersible ship,reserve buoyancy is increased by the presence of void spaces above the waterline in the().
A (n) () is a chemical or electro-chemical attack on the metal surface which may be further increased if the sea-water is polluted.
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
What does MBDD mean on the load waterline mark?().
Traditionally, people gave Christmas gifts or money to their staff or servants on ()which is the day after Christmas.
A file on the system ahs been lost, but the latest version is on a mksysb tape. The file is extracted from this mksysb tape by loading the tape. Which of the following indicates where the tape will be skipped forward?()
Which of the following actions are stated in the correct order prior to loading or discharging cargo on a Ro-Ro vessel? ()
Which is the summer load waterline on the load waterline mark?().
Which is the winter load waterline on the load waterline mark?().
广告位招租WX:84302438

免费的网站请分享给朋友吧