首页/ 题库 / [单选题]The rescue plan rece的答案

The rescue plan recently approved by the American government of the current American financial storm reminds us of the Emergency Banking Act presented by President Roosevelt in his _____.

单选题
2022-05-09 11:54
A、Amendment V.
B、Bill of Rights
C、Marshall Plan
D、New Deal
查看答案

正确答案
D

试题解析

1933年,为了解决经济大萧条的问题,美国总统罗斯福实施了一系列政策措施,史称新政(New Deal);其中他要求国会于3月9日举行特别会议审议《紧急银行法》(the Emergency Banking Act),该法于当天迅速通过;新政并没有结束大萧条,但有效地是经济状况得到了改善。

感兴趣题目
For the purpose of()tank or hold washings from any vessel,an application shall be made to Harbor Authorities for approval.
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
The rescue plan recently approved by the American government of the current American financial storm reminds us of the Emergency Banking Act presented by President Roosevelt in his _____.
The approval period for a shipboard Oil Pollution Emergency Plan expires after().
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
The schedule management plan is a component of the project management plan. The Schedule management plan maybe formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
The schedule management plan is a component of the project management plan The schedule management plan may be formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
The Ship Security Plan should be submitted to() for approval.
相关题目
On a ship,a fixed carbon dioxide or other approved system must be installed().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
The manager or his assistant ______ planning to go

()involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application area.

Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
The older New England villages have changed relatively little()a gas station or two in recent decades.
In the northern hemisphere, the largest waves or swells created by a typhoon or hurricane will be located().
● The completion and approval of one or more () characterizes a project phase.()A.deliverables B.products C.projects D.programs
We finally managed to()the committee's approval of our plans.
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
For the purpose of()tank or hold washings from any vessel,an application shall be made to Harbor Authorities for approval.
In ______, the only element that can be deleted or removed is the one that was inserted most recently.
In(74), the only element that can be deleted or removed is the one that was inserted most recently.
● In (74) the only element that can be deleted or removed is the one that was inserted most recently.(74)
广告位招租WX:84302438

免费的网站请分享给朋友吧