You set up scheduled tasks to run and notify you of any failures. 3 days later you see that none of the tasks ran and you received no notifications. What should you do?()
You are the network administrator for You manage a Windows
Server 2003 computer named TestKing1.
There are multiple scheduled tasks configure on TestKing1. One task is a scheduled
backup job. You need to temporarily disable the backup job from running so that
you can troubleshoot a problem. You must not interfere with any other scheduled
tasks.
You need to disable the scheduled backup job. You want to achieve this goal by
using the minimum amount of administrative effort.
What should you do?()
You have a file server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2).
You need to use Windows Backup to meet the following requirements:
·Minimize the number of scheduled backup jobs.
·Perform a scheduled normal backup to disk every Friday.
·Perform a scheduled normal backup to tape every Friday.
·Perform scheduled differential backups to tape every Monday, Tuesday, Wednesday, and Thursday.
How many scheduled jobs should you create from Windows Backup? ()
A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches.
Which of the following must you do to accomplish this?()
You need to perform these tasks:
1. Create and assign a MANAGER role to Blake and Clark
2. Grant CREATE TABLE and CREATE VIEW privileges to Blake and Clark
Which set of SQL statements achieves the desired results? ()
免费的网站请分享给朋友吧